
How to Set Up and Run the FG5
3
41. Connect the gray ribbon cable from the “rear of the patch panel to the
connector on the computer. Note the location of Pin 1 (white arrow) in both
cases.
42. Connect the BNC cable from the interferometer base “TTL” connector to the
“FRINGES” connector on the computer time interval card, identified as
“Channel A” in the Time Interval Analyzer (TIA) operating manual.
43. Connect the BNC cable from the “10 MHz” connector on the power supply to
the “CLK” connector on the computer time interval card, identified as “EXT
CLK” in the TIA operating manual.
44. Connect the BNC cable from the TRIG OUT connector on the dropper
controller to the “TRIG” connector on the computer time interval card,
identified as “EXT ARM” in the TIA operating manual.
45. Connect the barometer cable from the power supply to Channel 4 on the
patch panel.g
46. For the WEO Model 100 laser:
Connect the BNC cable from the OUTPUT connector on the front panel of the
laser controller to Channel 3 of the patch panel . Make sure the meter select
switch on the laser controller is set to the “1F” position.
47. For the Model ML-1 Laser: Connect the LASER LOCK on the patch panel to
the REMOTE BNC on the back of the ML-1 controller (this allows the laser
mode to be switched from “red” to “blue”). Connect the DIG C5 output on
the patch panel to REMOTE2 BNC connector on the back of the ML-1
controller (this enables the warmup/lock mode) .
48. Connect the BNC cable from the SPHERE OUT connector on the superspring
controller to the Channel 1 of the patch panel.
49. Connect the BNC cable from the METER MONITOR connector on the ion
pump power supply to Channel 2 of the patch panel. Set the meter select
switch to the 10
-4
µ
A scale.
50. Connect the BNC cable from the TRIG OUT connector on the patch panel to
the TRIG EXT IN connector on the dropping chamber controller.
3-10
Содержание Micro-g LaCoste FG5
Страница 7: ...Table of Figures This Page is Intentionally Blank vii ...
Страница 8: ......
Страница 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Страница 21: ...Design Components and Function 2 Figure 2 8 Side view of interferometer optics and beam path 2 11 ...
Страница 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Страница 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Страница 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Страница 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Страница 56: ......
Страница 59: ...Adjustment and Maintenance 4 4 3 ...
Страница 78: ...Adjustment and Maintenance 4 4 22 ...
Страница 106: ......
Страница 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Страница 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Страница 144: ......