
Checklists and Logs
Appendix D
Remove top drag-free cover from cart and pull out of the way (do
not detach or damage wires connected to it).
Note orientation of top part of test mass to V-plate.
Remove top part of test mass from posts which pass through V-
plate.
Lower bottom part of test mass through V-plate.
Remove old V-plate and replace with new one.
Reverse procedure to reassemble.
Table 9-9 Replacing V-Plate
9.4.7.Replacing the Linear Bearings
Replacing Linear Bearings Checklist
Remove dropping chamber cover.
Remove drive belt.
Remove top rod ring.
Remove upper bumper stop assembly.
Remove ribbon cable wires and clamp from cart.
Lift cart off guide rods.
9-11
Содержание Micro-g LaCoste FG5
Страница 7: ...Table of Figures This Page is Intentionally Blank vii ...
Страница 8: ......
Страница 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Страница 21: ...Design Components and Function 2 Figure 2 8 Side view of interferometer optics and beam path 2 11 ...
Страница 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Страница 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Страница 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Страница 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Страница 56: ......
Страница 59: ...Adjustment and Maintenance 4 4 3 ...
Страница 78: ...Adjustment and Maintenance 4 4 22 ...
Страница 106: ......
Страница 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Страница 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Страница 144: ......