
Checklists and Logs
Appendix D
Monitor voltage at ion pump controller (should be 2 KV within 5
minutes and rising).
Table 9-3 FG5 Pump Down and Bake Out
9.4. Dropping Chamber Maintenance
9.4.1.Removing Dropping Chamber Cover
Removing Dropping Chamber Cover Checklist
Remove blank flange from vacuum valve.
Unlock valve locking ring and slowly open valve. Vent with dry
nitrogen, if possible
Remove top flange.
Loosen snubber lock nuts and screws.
Remove chamber cover from service ring. Keep bottom flange
clean and protect O-ring surface.
Table 9-4 Removing Dropping Chamber Cover
9.4.2.Replacing Dropping Chamber Cover
Replacing Dropping Chamber Cover Checklist
Inspect chamber O-ring and sealing surfaces. Lubricate O-ring, if
necessary.
Lower chamber cover over dropping mechanism.
9-7
Содержание Micro-g LaCoste FG5
Страница 7: ...Table of Figures This Page is Intentionally Blank vii ...
Страница 8: ......
Страница 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Страница 21: ...Design Components and Function 2 Figure 2 8 Side view of interferometer optics and beam path 2 11 ...
Страница 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Страница 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Страница 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Страница 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Страница 56: ......
Страница 59: ...Adjustment and Maintenance 4 4 3 ...
Страница 78: ...Adjustment and Maintenance 4 4 22 ...
Страница 106: ......
Страница 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Страница 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Страница 144: ......