
Checklists and Logs
Appendix D
been open to air, open the bellows valve.
Plug in turbo pump power cord and turn on pump.(keep bellows
valve closed).
Wait to see that turbo-pump has reached normal operation. Open
bellows valve if necessary. (after evacuating air in flexible tube).
Remove magnet package from ion pump (if heating is required).
Connect heat tape and temperature sensors to dropper and ion
pump (if heating is required).
Lock test mass.
Monitor dropper and ion pump temperatures (dropper < 80° C).
Bake dropper and ion pump for at least 8 hours.
Turn off heat tapes. Allow dropper to cool at least 16 hours.
Unlock test mass.
Reinstall ion pump magnet package.
Connect HV and ground cables between ion pump controller and
ion pump.
Turn on ion pump controller to start ion pump.
9-6
Содержание Micro-g LaCoste FG5
Страница 7: ...Table of Figures This Page is Intentionally Blank vii ...
Страница 8: ......
Страница 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Страница 21: ...Design Components and Function 2 Figure 2 8 Side view of interferometer optics and beam path 2 11 ...
Страница 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Страница 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Страница 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Страница 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Страница 56: ......
Страница 59: ...Adjustment and Maintenance 4 4 3 ...
Страница 78: ...Adjustment and Maintenance 4 4 22 ...
Страница 106: ......
Страница 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Страница 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Страница 144: ......