50
brake too often, which cause inflation or robust of gas suffered from heating.
Tire explosion is much powerful than disinflation that can cause tire, wheel rim, and
eventually transmission parts flying 500 meters away from the machine. Explosive
force and fragments of the explosion can lead to casualties and property damage.
Recommend to fill the tire with nitrogen. If the tire is filled with air, it is recommended to
use nitrogen to adjust gas pressure, and nitrogen can mix with atmospheric gas. Tire
filled with nitrogen will decrease the possibility of explosion, for nitrogen is
incombustible, besides this, nitrogen can prevent the oxidation and aging of rubber
and corrosion of wheel rim parts.
Equipment and staff are needed to avoid over-inflation. Leakage or rim damage is due
to the incorrect or improper use of inflatable equipment.
1.8.23 PRECAUTIONS OF TIRE STORAGE
Tires shall be stored in warehouses, and unauthorized personnel are not allowed of
entering. If the tires are stored outdoors, there shall be fence erected around the tires.
If the tire is put onto ground with its side, it will be squeezed, and its quality declines.
If the tire is falling down, it is better to run away, for the tires of engineering machinery are
extremely heavy, therefore, any attempts to stop its falling may lead to serious injury.
Erect the tires on level ground, fixed with wedge, even if touched by unauthorized
personal, they cannot fall down.
1.9CATALOG AND REPLACEMENT CYCLE OF CRITICAL
SAFETY PARTS
To ensure the security of loader in operation, the user shall insist on regular maintenance.
In addition, in order to enhance security, the user shall regularly replace parts as listed in
the following table. The materials of these parts will deteriorate as time goes by, or tend to
be worn and eroded easily. It is difficult to judge the condition of the parts only through
regular maintenance, no matter what conditions they are in. These parts shall be replaced
regularly to ensure the use performance of safety critical parts.
If the specified replacement time is not reached and the safety critical parts already do not
work well, they shall be repaired or replaced immediately.
If pipe clamp used to fix the tube has any damage, such as distortion or crack, it shall be
changed with the tube.
When replacing tube, be sure to replace O-ring, gasket and parts like this at the same
time.
Please contact designated dealer of LONKING Holdings Limited to replace critical safety
parts.
Содержание LG833NG
Страница 56: ...56 2 2 OUTLINE DRAWING OF LG833NG LG833BGIII 00I WHEEL LOADER...
Страница 64: ...64 Rear combination lamp Rear working lamp In cab lamp...
Страница 133: ...133...