Operator manual
Corival
23
test
Ramp P=160W t=09:40
6P dP=-060W dt=060s
back next
test
Step P= 0W t=00:00
1S dP=+050W dt=060s
esc next
test
Torq P= 10W t=01:00
2T T= 10Nm dt=030s
back next
Confirm the S with
( )
, use the
▼
key to decrease the workload to 10 watt.
7.
Press the confirmation button NEXT until you reach the following screen. Adjust time
dt to 60 seconds using the
▼▲
keys.
8.
Select T with the
▼▲
keys and adjust the Torque to 10 Nm and the duration to 30
seconds with the same keys. Press the confirmation button.
9.
Select L with the
▼▲
keys and confirm the constant
α
=0.041, change the duration to
10 seconds. Press the confirmation button.
10.
Select H with the
▼▲
keys and change the heart rate in 120/m for a duration of 180
seconds, press the confirmation button.
11.
Select P with the
▼▲
keys and change the Workload to 150 in duration of 300
seconds, press the confirmation button.
12.
Select P with the
▼▲
keys and change the Workload to minus 60 in 60 seconds, press
the confirmation button.
13.
Select Recovery the
▼▲
keys and change the Workload to 35 and press the
confirmation button.
14.
After confirmation you will automatically go to the BPM menu.
15.
Select No BPM when the BPM module is not installed or select Repeat with the
▼▲
keys and choose 2 minutes for the repeat time, confirm with
( )
and choose 2 minutes
for the repeat time in the recovery stage. The protocol TEST (with BPM) is ready
now, you can go to protocol RUN to test this special protocol (not for normal use).
To edit an existing protocol, you have to select the desired protocol first. You can change the
name or confirm the name with OK
( )
ten times. Now you can walk through the stages with
the confirmation button, until you reach the stage you want to edit. You have to scroll through