![Loctite 97039 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/loctite/97039/97039_operating-manual_1933798015.webp)
15
4 Installation
4.3 Connecting the Unit
Pay attention to a stabile power supply of
nominal 230 V AC and
minimum 220 V AC, 50 Hz.
•
Connect connections cord
3
and
supplied power cord.
4.4 Startup in Cold Conditions
•
Press power button. Power button will illuminate.
•
Wait approx. 3 minutes for warm-up of the UV-bulb to the operating temperature.
Then the system is ready for curing.
Содержание 97039
Страница 1: ...20 Operating Manual Bedienungsanleitung UVALOC 400 97039 ...
Страница 2: ...2 Contents English 3 21 Deutsch 22 40 ...
Страница 47: ...47 ...