54
80-160
Safety
OPERATIONAL AIDS - EMERGENCY PROCEDURES
When operational aids are inoperative or malfunctioning, the following requirements shall apply for
continued use or shutdown of the crane.
1. Steps shall be taken to schedule repairs immediately. The operational aids shall be put back into
service as soon as replacement parts, if required, are available and the repairs and calibration can
be carried out. “Can be carried out” does not mean, when convenient. Every effort must be made
to expedite the repairs and recalibration.
2. When a load indicator, rated capacity indicator, or rated capacity limiter is inoperative or
malfunctioning, the designated person responsible for supervising the lifting operations shall
establish procedures for determining load weights. Loads with unknown weights shall not be
lifted without a properly functioning load indicating device.
3. When a boom angle or radius indicator is inoperative or malfunctioning, radii or boom angle shall
be determined by measurement.
4. When an ATB device, two-blocking damage prevention or two-block warning device is
inoperative or malfunctioning, the designated person responsible for supervising the lifting
operations shall establish procedures, such as assigning and additional signal person, to furnish
equivalent protection.
5. When a boom length indicator is inoperative or malfunctioning, the designated person responsible
for supervising the lifting operations shall establish the boom length at which the lift will be made
by actual measurement or marking on the boom.
6. When a level indicator is inoperative or malfunctioning, other means shall be used to level the
crane.
►
►
ANSI / ASME B30.5 Standard calls for the crane to be leveled within 1% or 0.6°.
►
If there is no mechanical level on the crane, a 4 ft carpenter’s level (on a machined surface
that would be parallel to the top of the swing bearing) is the generally accepted substitute.
►
Risk of overturning! Operation of the crane is only permitted when the crane is aligned
horizontally!
In certain situations, it may be necessary to override the automatic motion limiter of the RCI / ATB unit
in order to safely operate the crane. These include but are not limited to:
The load block may lift the ATB weight before the load line can be tensioned while stowing the boom.
This will cause a motion cutout. Overriding the system, in this situation is acceptable in order to continue
to winch in slack line, securing the boom. Boom must be in the lowered position.
If the Boom Up/Down control joystick is pushed in up position after the boom is fully raised, pressure
will be trapped in the base of the main cylinder. This will cause a motion cutout. Overriding the system
is acceptable in order to boom down enough to release the trapped pressure.
Содержание 80-160
Страница 1: ...OPERATORS MANUAL LOAD KING 80 160 REV B DECEMBER 2020...
Страница 2: ...Page Intentionally Blank...
Страница 18: ...Page Intentionally Blank...
Страница 26: ...26 80 160 Safety 80 160 Safety Sign Locations Right Hand Side View Left Hand Side View...
Страница 27: ...27 Rear View Front View...
Страница 28: ...28 80 160 Safety Upper Cab...
Страница 43: ...43 26 Fall Hazard Falling can result in death or serious injury Use the provided access system 26...
Страница 69: ...69 4 NOTE Do not use item 4 Console Arm lift handle as a grab handle for entering or exiting the operator s cab...
Страница 70: ...70 80 160 Safety Access Egress Rear...
Страница 84: ...84 80 160 Assembly 8 Remove the guide rope 9 Reeve the hoist line over the tubular jib sheave 3 3...
Страница 98: ...98 80 160 Assembly...
Страница 106: ...106 80 160 Description Of Machine and Controls 14 LH Control Lever Operator s Seat Controls 14 15 16...
Страница 118: ...118 80 160 Description Of Machine and Controls Lifting controls screen Cab controls screen...
Страница 122: ...122 80 160 Description Of Machine and Controls MIRROR HEAT SUSPENSION RAISE LOWER TAG AXLE LIFT ABS DIAGNOSTIC...
Страница 124: ...124 80 160 Description Of Machine and Controls 1 1 PTO Engage Switch...
Страница 126: ...126 80 160 Description Of Machine and Controls OUTRIGGER CONTROLS SCREEN Outrigger controls screen...
Страница 137: ...137 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Страница 155: ...155 OBSERVE CAUTION NOTES ON OUTRIGGER MOVEMENT WHENEVER SETTING UP OR STOWING OUTRIGGERS...
Страница 166: ...166 80 160 Operating Instructions Operating Radius 1 2 3 1 1 Center Line of Bearing 3 Load Radius 2 Center Line of Load...
Страница 194: ...194 80 160 Operating Instructions Towing or Pushing Vehicle The engine cannot be started by pushing or towing...
Страница 206: ...Page Intentionally Blank...
Страница 209: ...209 8 Install the pin 5 in the guide sheave kickstand 5 9 Remove the lower left hand pin 7 7...
Страница 257: ...257 Master Lubrication Chart 13 14 5 4 3 2 2 8 12 9 7 6 15 10 11 BOOM BLOCK TOP VIEW...
Страница 297: ...297 DIM in FREIGHTLINER KENWORTH WESTERN STAR R 35 94 S 161 0 T 14 5 U 18 6 V 12 9 W 27 87 27 87 27 87...
Страница 300: ...Page Intentionally Blank...
Страница 326: ...Page Intentionally Blank...
Страница 329: ...329 1 Proximity Sensor Outrigger Swing Outrigger Beam Retracted 2 Proximity Sensor Outrigger Beam Extend...
Страница 331: ...331 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Страница 333: ...333...
Страница 354: ...Page Intentionally Blank...
Страница 361: ...361 Torque Specs SAE Metric NOTE Refer to specific instructions for individual components super cede these values...
Страница 362: ...362 80 160 Appendix...
Страница 366: ...80 160 Notes...
Страница 369: ...80 160 Operator Manual...