Operating Instructions
Making a Typical Lift
LIFT PROCEDURE In making lifts, the operator must successfully coordinate several crane functions.
These include the boom raise/lower, boom extend/retract, load hoist/lower and swing functions.
Although experienced operators tend to operate two or more of these functions simultaneously, the lift
procedure can be broken down into the following sequence of operations.
OUTRIGGERS Set the outriggers as follows before initiating any lifting operations:
1. Remove the outrigger beam retaining pins, extend beams, and reinstall retaining pins.
2. To set the four (4) outriggers evenly, operate switches to raise crane to a level position. When level,
retract jacks (together) at one end of crane an inch or so, and then extend them again (together)
until crane is level. Then repeat this process for the opposite end of crane. This equalizes pressure
in all four jacks. The controls for the out and down outriggers are mounted on the dash. The extend/
retract master switch must be actuated before the appropriate function switches can be actuated
to operate the outriggers.
The outrigger beams MUST BE PROPERLY POSITIONED FOR THE LOAD RATING CHART BEING
USED, and the crane leveled prior to extending the boom or lifting loads. To achieve this condition,
the vertical jack cylinders should be extended until the tires are raised free of the supporting
surface.
FULL extension of the vertical jack cylinders should be avoided if not necessary to level
the crane and raise wheels clear of the ground because oil expansion under extreme
heat conditions can cause cylinder seal failure. Check to ensure that all beams are fully
extended, swinging the upper if necessary to visually check that each beam reaches
full extension. Level the crane by viewing the IC-1 screen which will show the crane on
the X-axis and Y-axis relative to 0.0 degrees. While operating the crane, frequently
check and level the outriggers between lifts.
The operator must exercise sound judgment in positioning the outriggers. The
outriggers should not be set near holes, on rocky ground or on extremely soft ground.
Setting the outriggers in such locations may result in the crane tipping, causing
personal injury or property damage. Where a firm footing or level ground is not
otherwise available, it should be provided by substantial timbers, solid blocking, or
other structural members sufficient to distribute the load so as not to exceed the safe
bearing capacity of the underlying material, and to enable leveling of the crane.
Proper positioning of the outriggers is critically important to both the safety and effectiveness of
craning operations.
Содержание 80-160
Страница 1: ...OPERATORS MANUAL LOAD KING 80 160 REV B DECEMBER 2020...
Страница 2: ...Page Intentionally Blank...
Страница 18: ...Page Intentionally Blank...
Страница 26: ...26 80 160 Safety 80 160 Safety Sign Locations Right Hand Side View Left Hand Side View...
Страница 27: ...27 Rear View Front View...
Страница 28: ...28 80 160 Safety Upper Cab...
Страница 43: ...43 26 Fall Hazard Falling can result in death or serious injury Use the provided access system 26...
Страница 69: ...69 4 NOTE Do not use item 4 Console Arm lift handle as a grab handle for entering or exiting the operator s cab...
Страница 70: ...70 80 160 Safety Access Egress Rear...
Страница 84: ...84 80 160 Assembly 8 Remove the guide rope 9 Reeve the hoist line over the tubular jib sheave 3 3...
Страница 98: ...98 80 160 Assembly...
Страница 106: ...106 80 160 Description Of Machine and Controls 14 LH Control Lever Operator s Seat Controls 14 15 16...
Страница 118: ...118 80 160 Description Of Machine and Controls Lifting controls screen Cab controls screen...
Страница 122: ...122 80 160 Description Of Machine and Controls MIRROR HEAT SUSPENSION RAISE LOWER TAG AXLE LIFT ABS DIAGNOSTIC...
Страница 124: ...124 80 160 Description Of Machine and Controls 1 1 PTO Engage Switch...
Страница 126: ...126 80 160 Description Of Machine and Controls OUTRIGGER CONTROLS SCREEN Outrigger controls screen...
Страница 137: ...137 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Страница 155: ...155 OBSERVE CAUTION NOTES ON OUTRIGGER MOVEMENT WHENEVER SETTING UP OR STOWING OUTRIGGERS...
Страница 166: ...166 80 160 Operating Instructions Operating Radius 1 2 3 1 1 Center Line of Bearing 3 Load Radius 2 Center Line of Load...
Страница 194: ...194 80 160 Operating Instructions Towing or Pushing Vehicle The engine cannot be started by pushing or towing...
Страница 206: ...Page Intentionally Blank...
Страница 209: ...209 8 Install the pin 5 in the guide sheave kickstand 5 9 Remove the lower left hand pin 7 7...
Страница 257: ...257 Master Lubrication Chart 13 14 5 4 3 2 2 8 12 9 7 6 15 10 11 BOOM BLOCK TOP VIEW...
Страница 297: ...297 DIM in FREIGHTLINER KENWORTH WESTERN STAR R 35 94 S 161 0 T 14 5 U 18 6 V 12 9 W 27 87 27 87 27 87...
Страница 300: ...Page Intentionally Blank...
Страница 326: ...Page Intentionally Blank...
Страница 329: ...329 1 Proximity Sensor Outrigger Swing Outrigger Beam Retracted 2 Proximity Sensor Outrigger Beam Extend...
Страница 331: ...331 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Страница 333: ...333...
Страница 354: ...Page Intentionally Blank...
Страница 361: ...361 Torque Specs SAE Metric NOTE Refer to specific instructions for individual components super cede these values...
Страница 362: ...362 80 160 Appendix...
Страница 366: ...80 160 Notes...
Страница 369: ...80 160 Operator Manual...