![LOAD KING 80-160 Скачать руководство пользователя страница 289](http://html1.mh-extra.com/html/load-king/80-160/80-160_operators-manual_1932350289.webp)
289
Anti-Two-Block System
MAINTENANCE
This crane is equipped with an ATB system for both main boom head and jib which sounds a horn (when
in the “on” position) and lights a light when a two-blocking condition is imminent. The system will also
electrically disconnect the circuit for winching up or extending the boom in the event of an imminent
2-block condition. Verify that the two-blocking system is functioning properly by performing the following
procedure.
Check ATB switch(es) and freedom of chain-hung counterweight (item 6) as shown on main boom head
in graphic below or in similar application on jib. Check the plug and socket connection at boom head
and on jib, if erected and reeved, for connection. The jib connector must be plugged into the boom head
receptacle. Check system indication and shut-off, by manually lifting chain hung counterweight( s). A
warning light should come on, horn, if in “on” position, should sound, and shut-off system should
disconnect controls. Check entire length of cable and cable reel for evidence of damage. Check spring
loaded cable reel. Ensure it has spring tension and is free to rotate. Check cab control unit. If the crane
is equipped with control linkage disconnect, perform the following checks, also.
1
5
6
1
2
3
4
1 2-Block Wire
4 2-Block Switch
2 2-Block Reel
5 2-Block Chain
3 2-Block Wire (to collector ring)
6 2-Block Weight
1. With the engine ignition key in the “off” position, check that free action (no selfcentering) occurs on
the boom lowering pedal, the boom telescope lever- extended direction, and the winch lever (S) -
raising direction.
2. With the engine ignition key in the “on” position, check to be sure that these controls latch (remain
in the neutral position) and provide a normal centering action.
NOTE:
This may require lowering the hook block away from the trip mechanism at the boom head
to enable the “latching” of controls.
Содержание 80-160
Страница 1: ...OPERATORS MANUAL LOAD KING 80 160 REV B DECEMBER 2020...
Страница 2: ...Page Intentionally Blank...
Страница 18: ...Page Intentionally Blank...
Страница 26: ...26 80 160 Safety 80 160 Safety Sign Locations Right Hand Side View Left Hand Side View...
Страница 27: ...27 Rear View Front View...
Страница 28: ...28 80 160 Safety Upper Cab...
Страница 43: ...43 26 Fall Hazard Falling can result in death or serious injury Use the provided access system 26...
Страница 69: ...69 4 NOTE Do not use item 4 Console Arm lift handle as a grab handle for entering or exiting the operator s cab...
Страница 70: ...70 80 160 Safety Access Egress Rear...
Страница 84: ...84 80 160 Assembly 8 Remove the guide rope 9 Reeve the hoist line over the tubular jib sheave 3 3...
Страница 98: ...98 80 160 Assembly...
Страница 106: ...106 80 160 Description Of Machine and Controls 14 LH Control Lever Operator s Seat Controls 14 15 16...
Страница 118: ...118 80 160 Description Of Machine and Controls Lifting controls screen Cab controls screen...
Страница 122: ...122 80 160 Description Of Machine and Controls MIRROR HEAT SUSPENSION RAISE LOWER TAG AXLE LIFT ABS DIAGNOSTIC...
Страница 124: ...124 80 160 Description Of Machine and Controls 1 1 PTO Engage Switch...
Страница 126: ...126 80 160 Description Of Machine and Controls OUTRIGGER CONTROLS SCREEN Outrigger controls screen...
Страница 137: ...137 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Страница 155: ...155 OBSERVE CAUTION NOTES ON OUTRIGGER MOVEMENT WHENEVER SETTING UP OR STOWING OUTRIGGERS...
Страница 166: ...166 80 160 Operating Instructions Operating Radius 1 2 3 1 1 Center Line of Bearing 3 Load Radius 2 Center Line of Load...
Страница 194: ...194 80 160 Operating Instructions Towing or Pushing Vehicle The engine cannot be started by pushing or towing...
Страница 206: ...Page Intentionally Blank...
Страница 209: ...209 8 Install the pin 5 in the guide sheave kickstand 5 9 Remove the lower left hand pin 7 7...
Страница 257: ...257 Master Lubrication Chart 13 14 5 4 3 2 2 8 12 9 7 6 15 10 11 BOOM BLOCK TOP VIEW...
Страница 297: ...297 DIM in FREIGHTLINER KENWORTH WESTERN STAR R 35 94 S 161 0 T 14 5 U 18 6 V 12 9 W 27 87 27 87 27 87...
Страница 300: ...Page Intentionally Blank...
Страница 326: ...Page Intentionally Blank...
Страница 329: ...329 1 Proximity Sensor Outrigger Swing Outrigger Beam Retracted 2 Proximity Sensor Outrigger Beam Extend...
Страница 331: ...331 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Страница 333: ...333...
Страница 354: ...Page Intentionally Blank...
Страница 361: ...361 Torque Specs SAE Metric NOTE Refer to specific instructions for individual components super cede these values...
Страница 362: ...362 80 160 Appendix...
Страница 366: ...80 160 Notes...
Страница 369: ...80 160 Operator Manual...