151
- Operational planning:
- Higher floor loading than provided for,
- difficult handling of the additional test load,
- ban on carrying out any overload tests on-site in some fields of industry
(e.g. petrochemical plants).
- Operational safety:
- Anyone in the vicinity of the crane must be warned of the test procedure and
- must leave the area during the test.
Risk of accidents due to damage to load-bearing parts.
After an overload test, carry out extensive investigations to ensure the intactness of
the load-bearing components.
Damage to load-bearing parts can occur due to cracks caused by overload and/or fatigue; such defects
are not exposed by an overload test. For this reason, an overload test can give owners and operators a
false sense of security.
To ensure the intactness of load-bearing components, extensive investigations are recommended after
an overload test and before carrying out hoist work. Such an investigation consists of a visual inspection
combined with function tests (including the safety equipment) and can necessitate non-destructive
inspections such as magnetic particle or ultrasonic inspections.
Any malfunction or irregularity discovered during the inspection must be evaluated by an expert. This
person must determine whether the movement can be carried out safely or whether immediate repair/
modification is required.
Recommendations of Load King with Regard to Load Tests
Checking Assembly
Checking the correct crane assembly (e.g. after reconfiguration) must include:
- a visual inspection of all assembled parts on the ground before erecting the boom,
- a function check of the crane without or with limited load including:
• any movements important for the job
• an inspection of all limit switches (among others, the hoist limit switches),
- an inspection to ensure the assembly has been carried out in accordance with the assembly
instructions.
Load Test Factors
If load tests are required by laws mandating checking the assembly of the crane, 100% of the permitted
load of the crane in the given configuration must not be exceeded.
This applies to all
Load King
mobile cranes for the static and dynamic load tests. A period of 5 minutes
is sufficient for static tests.
Содержание 80-160
Страница 1: ...OPERATORS MANUAL LOAD KING 80 160 REV B DECEMBER 2020...
Страница 2: ...Page Intentionally Blank...
Страница 18: ...Page Intentionally Blank...
Страница 26: ...26 80 160 Safety 80 160 Safety Sign Locations Right Hand Side View Left Hand Side View...
Страница 27: ...27 Rear View Front View...
Страница 28: ...28 80 160 Safety Upper Cab...
Страница 43: ...43 26 Fall Hazard Falling can result in death or serious injury Use the provided access system 26...
Страница 69: ...69 4 NOTE Do not use item 4 Console Arm lift handle as a grab handle for entering or exiting the operator s cab...
Страница 70: ...70 80 160 Safety Access Egress Rear...
Страница 84: ...84 80 160 Assembly 8 Remove the guide rope 9 Reeve the hoist line over the tubular jib sheave 3 3...
Страница 98: ...98 80 160 Assembly...
Страница 106: ...106 80 160 Description Of Machine and Controls 14 LH Control Lever Operator s Seat Controls 14 15 16...
Страница 118: ...118 80 160 Description Of Machine and Controls Lifting controls screen Cab controls screen...
Страница 122: ...122 80 160 Description Of Machine and Controls MIRROR HEAT SUSPENSION RAISE LOWER TAG AXLE LIFT ABS DIAGNOSTIC...
Страница 124: ...124 80 160 Description Of Machine and Controls 1 1 PTO Engage Switch...
Страница 126: ...126 80 160 Description Of Machine and Controls OUTRIGGER CONTROLS SCREEN Outrigger controls screen...
Страница 137: ...137 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Страница 155: ...155 OBSERVE CAUTION NOTES ON OUTRIGGER MOVEMENT WHENEVER SETTING UP OR STOWING OUTRIGGERS...
Страница 166: ...166 80 160 Operating Instructions Operating Radius 1 2 3 1 1 Center Line of Bearing 3 Load Radius 2 Center Line of Load...
Страница 194: ...194 80 160 Operating Instructions Towing or Pushing Vehicle The engine cannot be started by pushing or towing...
Страница 206: ...Page Intentionally Blank...
Страница 209: ...209 8 Install the pin 5 in the guide sheave kickstand 5 9 Remove the lower left hand pin 7 7...
Страница 257: ...257 Master Lubrication Chart 13 14 5 4 3 2 2 8 12 9 7 6 15 10 11 BOOM BLOCK TOP VIEW...
Страница 297: ...297 DIM in FREIGHTLINER KENWORTH WESTERN STAR R 35 94 S 161 0 T 14 5 U 18 6 V 12 9 W 27 87 27 87 27 87...
Страница 300: ...Page Intentionally Blank...
Страница 326: ...Page Intentionally Blank...
Страница 329: ...329 1 Proximity Sensor Outrigger Swing Outrigger Beam Retracted 2 Proximity Sensor Outrigger Beam Extend...
Страница 331: ...331 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Страница 333: ...333...
Страница 354: ...Page Intentionally Blank...
Страница 361: ...361 Torque Specs SAE Metric NOTE Refer to specific instructions for individual components super cede these values...
Страница 362: ...362 80 160 Appendix...
Страница 366: ...80 160 Notes...
Страница 369: ...80 160 Operator Manual...