![LOAD KING 80-160 Скачать руководство пользователя страница 291](http://html1.mh-extra.com/html/load-king/80-160/80-160_operators-manual_1932350291.webp)
291
Storage
Storage
Machines being placed in storage must be adequately protected from deterioration during the period of
idleness. This will ensure that they can be restored to active service with a minimum effort.
Before removing this hydraulic crane from service for extended periods, it should be prepared for storage
as prescribed in the following paragraphs. In general, three (3) major components must undergo
preparation. These are the Machine Proper, the Engine and the Transmission. The specific procedure to
be followed depends upon the expected period of storage.
SHORT TERM STORAGE - 30 DAYS OR LESS
The MACHINE should be thoroughly cleaned, lubricated in accordance with Section 4, and painted
surfaces retouched where the paint has deteriorated. exposed portions of all hydraulic cylinders should
be coated with multipurpose grease. Coat unpainted metal surfaces with multipurpose grease after
removing any rust accumulations.
LONG TERM STORAGE - 30 DAYS OR MORE
Long term storage requires greater preparation than short term storage and must be undertaken with
greater care.
The MACHINE should be prepared as follows:
1. Perform the short term machine storage preparation, making certain that all points with grease
fittings are liberally lubricated.
2. Drain and refill the swing reducer, winch(es), axle differentials, planetary hubs and the hydraulic
reservoir. Refer to page Group 4 when servicing the reservoir.
3. Distribute the new hydraulic fluid to all parts of the system by operating all functions.
4. Clean and tape the battery cables after removing and storing the battery.
5. Coat the external ring gear of the swing bearing with open gear lubricant.
6. Block wheels so any rubber tires are not in contact with concrete. Cover tires if exposed to sunlight.
7. Fill the hydraulic reservoir to the top AFTER THE MACHINE IS PARKED IN ITS STORAGE SPOT.
8. Coat wire rope with lubricant.
9. Coat exposed cylinder rods with grease.
Содержание 80-160
Страница 1: ...OPERATORS MANUAL LOAD KING 80 160 REV B DECEMBER 2020...
Страница 2: ...Page Intentionally Blank...
Страница 18: ...Page Intentionally Blank...
Страница 26: ...26 80 160 Safety 80 160 Safety Sign Locations Right Hand Side View Left Hand Side View...
Страница 27: ...27 Rear View Front View...
Страница 28: ...28 80 160 Safety Upper Cab...
Страница 43: ...43 26 Fall Hazard Falling can result in death or serious injury Use the provided access system 26...
Страница 69: ...69 4 NOTE Do not use item 4 Console Arm lift handle as a grab handle for entering or exiting the operator s cab...
Страница 70: ...70 80 160 Safety Access Egress Rear...
Страница 84: ...84 80 160 Assembly 8 Remove the guide rope 9 Reeve the hoist line over the tubular jib sheave 3 3...
Страница 98: ...98 80 160 Assembly...
Страница 106: ...106 80 160 Description Of Machine and Controls 14 LH Control Lever Operator s Seat Controls 14 15 16...
Страница 118: ...118 80 160 Description Of Machine and Controls Lifting controls screen Cab controls screen...
Страница 122: ...122 80 160 Description Of Machine and Controls MIRROR HEAT SUSPENSION RAISE LOWER TAG AXLE LIFT ABS DIAGNOSTIC...
Страница 124: ...124 80 160 Description Of Machine and Controls 1 1 PTO Engage Switch...
Страница 126: ...126 80 160 Description Of Machine and Controls OUTRIGGER CONTROLS SCREEN Outrigger controls screen...
Страница 137: ...137 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Страница 155: ...155 OBSERVE CAUTION NOTES ON OUTRIGGER MOVEMENT WHENEVER SETTING UP OR STOWING OUTRIGGERS...
Страница 166: ...166 80 160 Operating Instructions Operating Radius 1 2 3 1 1 Center Line of Bearing 3 Load Radius 2 Center Line of Load...
Страница 194: ...194 80 160 Operating Instructions Towing or Pushing Vehicle The engine cannot be started by pushing or towing...
Страница 206: ...Page Intentionally Blank...
Страница 209: ...209 8 Install the pin 5 in the guide sheave kickstand 5 9 Remove the lower left hand pin 7 7...
Страница 257: ...257 Master Lubrication Chart 13 14 5 4 3 2 2 8 12 9 7 6 15 10 11 BOOM BLOCK TOP VIEW...
Страница 297: ...297 DIM in FREIGHTLINER KENWORTH WESTERN STAR R 35 94 S 161 0 T 14 5 U 18 6 V 12 9 W 27 87 27 87 27 87...
Страница 300: ...Page Intentionally Blank...
Страница 326: ...Page Intentionally Blank...
Страница 329: ...329 1 Proximity Sensor Outrigger Swing Outrigger Beam Retracted 2 Proximity Sensor Outrigger Beam Extend...
Страница 331: ...331 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Страница 333: ...333...
Страница 354: ...Page Intentionally Blank...
Страница 361: ...361 Torque Specs SAE Metric NOTE Refer to specific instructions for individual components super cede these values...
Страница 362: ...362 80 160 Appendix...
Страница 366: ...80 160 Notes...
Страница 369: ...80 160 Operator Manual...