Chapter 3: Procedures
3-3
HYDROBAR EXPRESS 220
Step 4: Hand-tighten the top jam nut on SQ7 after setting the correct gap.
Hand-tighten
Step 5: Recheck the gap between the switch and the flag.
1mm gap
Step 6: Move the switch so that it is 2/3 over top of the flag and tighten the top jam nut by hand.
Step 7: Tighten the top jam nut with a 13mm combination wrench while holding the bottom nut in position. Be careful not to over
tighten and damage switch.
Hold in place
Tighten
Procedure complete.
Содержание Hydrobar Express 220
Страница 61: ......
Страница 143: ......
Страница 147: ......
Страница 154: ...Chapter 6 Spare Parts Spare Parts 6 7 HYDROBAR EXPRESS 220 Chapter 6 6 7 HYDROBAR EXPRESS 220 Chain Drive Assembly L F ...
Страница 155: ...6 8 Chapter 6 Spare Parts Spare Parts HYDROBAR EXPRESS 220 6 8 Chapter 6 HYDROBAR EXPRESS 220 Chain Drive Assembly R F ...
Страница 156: ...Chapter 6 Spare Parts 6 9 HYDROBAR EXPRESS 220 Servo Motor Assembly ...
Страница 157: ...6 10 Chapter 6 Spare Parts Spare Parts HYDROBAR EXPRESS 220 6 10 Chapter 6 HYDROBAR EXPRESS 220 Remnant Vise ...
Страница 158: ...Chapter 6 Spare Parts Spare Parts 6 11 HYDROBAR EXPRESS 220 Chapter 6 6 11 HYDROBAR EXPRESS 220 Sensor Support Assembly ...
Страница 161: ...6 14 Chapter 6 Spare Parts HYDROBAR EXPRESS 220 Hydraulic Pump Assembly ...
Страница 162: ...Chapter 6 Spare Parts Spare Parts 6 15 HYDROBAR EXPRESS 220 Chapter 6 6 15 HYDROBAR EXPRESS 220 Coding Disc Assembly ...
Страница 163: ...6 16 Chapter 6 Spare Parts HYDROBAR EXPRESS 220 Diameter Adjustment Motor Assembly ...
Страница 164: ...Chapter 6 Spare Parts 6 17 HYDROBAR EXPRESS 220 Air Regulator and Cable Passage Plate ...