
LINCOLN ELECTRIC
SAE-300® HE Service Manual
69
GENERATOR ARMATURE REMOVAL AND REPLACEMENT PROCEDURE
Service and repair should be performed by only Lincoln Electric factory trained personnel. Unauthorized
repairs performed on this equipment may result in danger to the technician or machine operator and will
invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety
notes and precautions detailed throughout this manual. If for any reason you do not understand the test
procedures or are unable to perform the test/repairs safely, contact the Lincoln Electric Service Department
for electrical troubleshooting assistance before you proceed. Call 1-888-935-3877.
TEST DESCRIPTION
This procedure will aid the technician in the removal and replacement of the Welding Generator Armature.
MATERIALS NEEDED
Rope Sling
Miscellaneous Hand Tools
Wiring Diagram
REMOVAL PROCEDURE
1.
Turn off the engine on the SAE-300 HE machine.
2.
Perform the
Alternator Rotor Removal Procedure
3.
Perform the
Alternator Stator Removal Procedure
4.
Perform the
Generator Frame Removal Procedure
5.
Using the rope sling, support the armature. Position the sling at the center of gravity of the
6.
Remove the eight screws securing the blower paddle segments and the outer diameter of the
flexible coupling disk to the flywheel.
7.
With the armature securely supported in the sling, unlock it from the flywheel by carefully rotating
it 1/8 of a turn in either direction.
REPLACEMENT PROCEDURE
1.
Carefully inspect the mating surfaces of the flywheel and armature coupling parts. These surfaces
must be clean and undamaged.
2.
Support the armature in a rope sling and carefully move it into position and align it to the flywheel.
3.
Rotate the armature 1/8 of a turn, in either direction, to engage the locking mechanism and line up
the bolt holes. Be certain that the coupling plate is fully and cleanly seated in the flywheel.
4.
Replace the eight screws and four blower segments. Tighten the screws.
5.
Perform the
Generator Frame Replacement Procedure
6.
Perform the
Alternator Stator Replacement Procedure
7.
Perform the
Alternator Rotor Replacement Procedure
8.
Perform the
Содержание SAE-300 HE
Страница 8: ...LINCOLN ELECTRIC SAE 300 HE Service Manual 3 Theory of Operation Figure F 1 Block Diagram ...
Страница 51: ...LINCOLN ELECTRIC SAE 300 HE Service Manual 46 Figure F 13 Rocker w marks ...
Страница 54: ...LINCOLN ELECTRIC SAE 300 HE Service Manual 49 Figure F 14 Brush spring Figure F 15 Windings insulated wedge ...
Страница 55: ...LINCOLN ELECTRIC SAE 300 HE Service Manual 50 Figure F 1 Insulator spring locations Figure F 2 Shaft tube ...
Страница 64: ...LINCOLN ELECTRIC SAE 300 HE Service Manual 59 Figure F 22 Rheostat terminal locations ...
Страница 68: ...LINCOLN ELECTRIC SAE 300 HE Service Manual 63 Figure F 25 Rotor removal ...
Страница 75: ...LINCOLN ELECTRIC SAE 300 HE Service Manual 70 Figure F 28 Sling lift ...
Страница 79: ...LINCOLN ELECTRIC SAE 300 HE Service Manual 74 Figure F 30 Current sense board plug location ...
Страница 83: ...LINCOLN ELECTRIC SAE 300 HE Service Manual 78 Figure F 32 Rheostat terminal locations ...