
Elevating Work Platform Operation Manual
77
6.1 No Operation Except
Following Cases
You have understood and practiced the
principles about safe operation of the machine
in this manual.
1) Avoid dangerous situations.
2) Always perform a pre-operation inspection.
3) Check the work place.
4) Always perform a pre-use functional test.
5) Use the machine only for its intended
purpose.
6.2 Basic Principles
1) The operator is responsible for checks
before operation and routine maintenance.
2) The check before operation is an intuitive
check process performed by the operator
prior to each shift. The purpose of the
check is to find out if there is an obvious
problem with the machine before the
operator performs a functional test.
3) The check before operation is also used to
determine
if
routine
maintenance
procedures are required. The operator is
only
allowed
to
perform
routine
maintenance items as specified in this
manual.
4) Please refer to the list on the next page and
check for changes, damage, loose or
missing parts for each item and location.
5) A damaged or modified machine shall not
be used. If damages or any unauthorized
changes are found, the machine shall be
tagged out and not operated.
6) Only qualified repair technicians can repair
machines as required by the manufacturer.
After repair, the operator must perform
check before operation again before
performing the functional test.
7) Regular repair and check shall be
performed by qualified repair technicians in
accordance
with
the
manufacturer's
specifications and the requirements listed
in the responsibility manual.
6.3 Check Before Operation
1) Ensure the manual is complete, legible and
stored in the document box on the platform.
2) Ensure all decals are clear, legible and
properly positioned. See the decal section.
3) Check engine oil leakage and oil level
appropriateness. See the "Repair" section.
4) Check for hydraulic oil leakage and proper
oil level. Fill as needed. See the "Repair"
section.
5) Check for engine coolant leakage and
proper coolant level. Add coolant as
needed. See the "Repair" section.
6) Check for battery leakage and proper
electrolyte level. Add distilled water as
needed. See the "Repair" section
7) Check the following components or areas
for damage, improper installation or
missing parts and unauthorized changes:
Electrical components, harnesses and
cables
Hydraulic hoses, connectors, valve blocks
and hydraulic cylinders
Fuel and hydraulic tanks
Wear pads
Tires and wheels
Engine and related components
Limit switches, alarms and horns
Nuts, bolts and other fasteners
Platform extension components
Platform entrance door
Indicators and alarms
Safety arm
Pins and fasteners
Platform control handle
Outrigger cover and foot pad
Check the entire machine for:
Cracks in welds or structural components
Indentation or damage to the machine
Содержание SR1018D
Страница 7: ...Elevating Work Platform Operation Manual V...
Страница 8: ...Elevating Work Platform Operation Manual 1 Chapter 1 Safety...
Страница 9: ...Elevating Work Platform Operation Manual 2...
Страница 16: ...Elevating Work Platform Operation Manual 9 Chapter 2 Machine Nomenclature...
Страница 17: ...Elevating Work Platform Operation Manual 10...
Страница 19: ...Elevating Work Platform Operation Manual 12...
Страница 20: ...Elevating Work Platform Operation Manual 13 Chapter 3 Decals and Warning Labels...
Страница 21: ...Elevating Work Platform Operation Manual 14...
Страница 22: ...Elevating Work Platform Operation Manual 15 SR1018D SR1218D Decals Diagram...
Страница 24: ...Elevating Work Platform Operation Manual 17 SR1018D SR1218D Decals...
Страница 25: ...Elevating Work Platform Operation Manual 18...
Страница 26: ...Elevating Work Platform Operation Manual 19 SR1023D SR1323D SR1623D Decals Diagram...
Страница 28: ...Elevating Work Platform Operation Manual 21 SR1023D SR1323D SR1623D Decals...
Страница 29: ...Elevating Work Platform Operation Manual 22...
Страница 30: ...Elevating Work Platform Operation Manual 23 Chapter 4 Specifications...
Страница 31: ...Elevating Work Platform Operation Manual 24...
Страница 55: ...Elevating Work Platform Operation Manual 48 air temperature 29 35 Diesel...
Страница 59: ...Elevating Work Platform Operation Manual 52...
Страница 60: ...Elevating Work Platform Operation Manual 53 Chapter 5 Control Station...
Страница 61: ...Elevating Work Platform Operation Manual 54...
Страница 82: ...Elevating Work Platform Operation Manual 75 Chapter 6 Pre Operation Check...
Страница 83: ...Elevating Work Platform Operation Manual 76...
Страница 86: ...Elevating Work Platform Operation Manual 79 Chapter 7 Workplace Check...
Страница 87: ...Elevating Work Platform Operation Manual 80...
Страница 89: ...Elevating Work Platform Operation Manual 82...
Страница 90: ...Elevating Work Platform Operation Manual 83...
Страница 91: ...Elevating Work Platform Operation Manual 84 Chapter 8 Functional Test...
Страница 92: ...Elevating Work Platform Operation Manual 85...
Страница 96: ...Elevating Work Platform Operation Manual 89...
Страница 97: ...Elevating Work Platform Operation Manual 90...
Страница 98: ...Elevating Work Platform Operation Manual 91 Chapter 9 Operation Instructions...
Страница 99: ...Elevating Work Platform Operation Manual 92...
Страница 104: ...Elevating Work Platform Operation Manual 97...
Страница 105: ...Elevating Work Platform Operation Manual 98 Chapter 10 Transportation and Lifting Instructions...
Страница 106: ...Elevating Work Platform Operation Manual 99...
Страница 109: ...102...