Elevating Work Platform Operation Manual
95
SR1023D/SR1323D/SR1623D:
Maximu
m rated value of
slope in folding
position.
40% (22
゜
)
Maximu
m rated value of side
slope in folding
state.
40% (22
゜
)
△
!
Notice: Rated value of slope is
limited by the ground conditions and
traction.
1) Determination of grade: Measure the slope
with a digital inclinometer or follow the
steps below.
2) Tools required: Carpenter’s ruler, straight
block with a length of at least 1m, tape
measure.
3) Place the block on the slope.
Place the carpentry’s ruler on the upper
edge of the block at the end of the downhill
slope and raise the end of the block until it
is level.
Keep the block level and measure the
vertical distance from the bottom of the
block to the ground.
Divide the tape measure distance (the
raised height) by the block length (travel)
and multiply by 100.
Example:
Wood block = 11.8ft
Travel = 11.8ft
Raised height = 0.98ft
0.98/11.8==8.3 % rating
4) If the slope exceeds the maximum uphill,
downhill or side slope rating, the vehicle
must be lifted or transported up and down
the slope. See the Transportation and
Lifting section for further instructions on
transporting the machine.
9.8 Platform Extension and
Retraction
1) Raise the extension lock handle of the
platform to the upper limit position (about
80
゜
) of handle.
2) Push the extension lock handle of the
platform to extend the platform to the
required position.
3) Do not stand on the extension platform
when extending the platform.
4) Press the extension lock handle of the
platform to make the upper and lower truss
plate engage with each other, to lock the
extension platform.
9.9 Emergency Descent
1) When unable to lower the platform normally
due to a fault, enable the emergency
descending function. Simultaneously press
the auxiliary function enabling button and
the auxiliary descent button to lower the
platform.
9.10 Using Platform Control
Station to Operate on the
Ground
1) Maintain a safe distance among operator,
machine and stationary objects.
2) Pay attention to the forward direction of
machine when using the control station.
9.11 Outrigger Operation
1) Put the machine in an accepted operation
area.
Notice: The engine must be running to
operate the outriggers.
2) Press and hold the automatic leveling
button.
Содержание SR1018D
Страница 7: ...Elevating Work Platform Operation Manual V...
Страница 8: ...Elevating Work Platform Operation Manual 1 Chapter 1 Safety...
Страница 9: ...Elevating Work Platform Operation Manual 2...
Страница 16: ...Elevating Work Platform Operation Manual 9 Chapter 2 Machine Nomenclature...
Страница 17: ...Elevating Work Platform Operation Manual 10...
Страница 19: ...Elevating Work Platform Operation Manual 12...
Страница 20: ...Elevating Work Platform Operation Manual 13 Chapter 3 Decals and Warning Labels...
Страница 21: ...Elevating Work Platform Operation Manual 14...
Страница 22: ...Elevating Work Platform Operation Manual 15 SR1018D SR1218D Decals Diagram...
Страница 24: ...Elevating Work Platform Operation Manual 17 SR1018D SR1218D Decals...
Страница 25: ...Elevating Work Platform Operation Manual 18...
Страница 26: ...Elevating Work Platform Operation Manual 19 SR1023D SR1323D SR1623D Decals Diagram...
Страница 28: ...Elevating Work Platform Operation Manual 21 SR1023D SR1323D SR1623D Decals...
Страница 29: ...Elevating Work Platform Operation Manual 22...
Страница 30: ...Elevating Work Platform Operation Manual 23 Chapter 4 Specifications...
Страница 31: ...Elevating Work Platform Operation Manual 24...
Страница 55: ...Elevating Work Platform Operation Manual 48 air temperature 29 35 Diesel...
Страница 59: ...Elevating Work Platform Operation Manual 52...
Страница 60: ...Elevating Work Platform Operation Manual 53 Chapter 5 Control Station...
Страница 61: ...Elevating Work Platform Operation Manual 54...
Страница 82: ...Elevating Work Platform Operation Manual 75 Chapter 6 Pre Operation Check...
Страница 83: ...Elevating Work Platform Operation Manual 76...
Страница 86: ...Elevating Work Platform Operation Manual 79 Chapter 7 Workplace Check...
Страница 87: ...Elevating Work Platform Operation Manual 80...
Страница 89: ...Elevating Work Platform Operation Manual 82...
Страница 90: ...Elevating Work Platform Operation Manual 83...
Страница 91: ...Elevating Work Platform Operation Manual 84 Chapter 8 Functional Test...
Страница 92: ...Elevating Work Platform Operation Manual 85...
Страница 96: ...Elevating Work Platform Operation Manual 89...
Страница 97: ...Elevating Work Platform Operation Manual 90...
Страница 98: ...Elevating Work Platform Operation Manual 91 Chapter 9 Operation Instructions...
Страница 99: ...Elevating Work Platform Operation Manual 92...
Страница 104: ...Elevating Work Platform Operation Manual 97...
Страница 105: ...Elevating Work Platform Operation Manual 98 Chapter 10 Transportation and Lifting Instructions...
Страница 106: ...Elevating Work Platform Operation Manual 99...
Страница 109: ...102...