Operation and Maintenance Manual of Aerial Work Platform
Result: the specific liquid gravity difference between the battery cells is greater than 0.1 or the specific
liquid gravity of more than one battery cell is less than 1.217. In such case, please replace the battery.
11)
Check the battery electrolyte height. If necessary, add the distilled water to the highest liquid level
indicator and do not add the excessive distilled water.
12)
Close the battery cover and neutralize the spilled electrolyte with the sodium bicarbonate solvent.
The following checks are suitable for batteries of any kind:
13)
Check if the battery cells in each battery pack are correctly connected.
14)
Check the excessive abrasion and damage of the battery charger plug and the wire insulation.
Replace the worn and damaged one in time, in any.
15)
Correctly connect the battery charge to the 100-260V, 50/60HZ AC power supply.
Result: the charger is running and charging the battery.
Result: the charger alarm rings and the indicator flashes. Please check and correct the connection of
fuse and charger.
Guarantee the normal operation of charger and charge the battery.
△
!
Notice: to achieve good effect, please make use of the wire with appropriate length. Keep the total
length below 15m.
△
!
Notice: for more information of charger operation, please contact the after-sales service department of
Lingong Heavy Machinery.
B-2
Wire inspection
1)
This check item shall be made once per 250h or per season, whichever is shorter.
2)
Keeping the wire in good conditions is essential to safe operation and good machine performance.
If the burn, scratched, eroded or bent wire is not discovered and replaced and is used in the
unsafe operation environment, the machine element may be damaged.
Electrocution/explosion danger
The thermal contact or the conductor may cause the serious injury and death. Do not put on the ring,
watch and other jewelry.
1)
Check if the ground wire below the chassis is lost or damaged.
2)
Check if there is any burn, scratched, eroded, bent or loosened wire in the areas below:
Internal of ground controller box
Wire of hydraulic block
Wire in battery area of the battery tray
Internal of platform controller box
3)
Switch the key switch to the platform controller and draw out the red emergency stop buttons from
the ground and platform controller.
4)
Lift the platform until reaching the height about 2.4mfrom the ground.
5)
Lift the safety prop, move it to the center of the scissor sleeve center and rotate it upward until it is
vertical.
6)
Lower the platform height until the safety prop completely contacts the shaft sleeve.
Crush hazard
Be sure to put your hand on correct position of the safety prop when lowering the platform.
7)
Check if there is any burn, scratched, eroded, bent and loosened wire in chassis and the scissor
area.
8)
Check if there is any burn, scratched, eroded, bent and loosened wire in the areas below:
59
Содержание S0507SDTCE10
Страница 5: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 1 Safety 1...
Страница 11: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 2 Legend 7...
Страница 12: ...Operation and Maintenance Manual of Aerial Work Platform 8...
Страница 14: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 3 Label 10...
Страница 15: ...Operation and Maintenance Manual of Aerial Work Platform 11...
Страница 16: ...Operation and Maintenance Manual of Aerial Work Platform 12...
Страница 18: ...Operation and Maintenance Manual of Aerial Work Platform 14...
Страница 19: ...Operation and Maintenance Manual of Aerial Work Platform 15...
Страница 21: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 4 Specification 17...
Страница 24: ...Operation and Maintenance Manual of Aerial Work Platform 20...
Страница 25: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 5 Controller 21...
Страница 37: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 6 Emergency operation 33...
Страница 40: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 7 Pre operation inspection 36...
Страница 43: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 8 Workstation inspection 39...
Страница 45: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 9 Function test 41...
Страница 49: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 10 Operation notice 45...
Страница 53: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 11 Transport and lifting instruction 49...
Страница 56: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 12 Maintenance 52...
Страница 76: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 13 Schematic diagram 72...
Страница 77: ...Operation and Maintenance Manual of Aerial Work Platform Electric schematic diagram 73...
Страница 78: ...Operation and Maintenance Manual of Aerial Work Platform Hydraulic schematic diagram 74...