Operation and Maintenance Manual of Aerial Work Platform
3)
Overturn the front guardrail of the extension platform, do not put your hands in a place that may be
injured.
4)
Install two disassembled steel wire latch back to each side of the guardrail bracket.
5)
Remove two wire latches in the middle of the left guardrail and turn the left guardrail of the
extended platform inward. Do not put the hand in the place where it may be injured.
6)
Install two dismantled wire lock pins back to the guardrail bracket.
7)
Remove two wire latches in the middle of the right guardrail and turn the right guardrail of the
extended platform inward. Do not put the hand in the place where it may be injured.
8)
Install two dismantled wire lock pins back to the guardrail bracket.
9)
Remove the wire lock of the upper guardrail of the door, and turn the upper guardrail inward , and
the hand should not be placed in the place where it may be injured.
10)
Install two dismantled wire lock pins back to the guardrail bracket.
11)
Remove the wire lock on the top of the left guardrail of the main platform and turn the left guardrail
inward . Do not put the hand in the place where it may be injured.
12) Install two dismantled wire lock pins back to the guardrail bracket.
13) Remove the wire lock on the top of the right guardrail of the main platform and turn the right
guardrail inward . Do not put the hand in the place where it may be injured.
14) Install two dismantled wire lock pins back to the guardrail bracket.
10.15
How to lift guide rail
Follow the guard rail folding instruction and adopt the sequence reverse to that of the installation.
10.16
Extending and retracting of platform
1)
Step on the positioning pedal on the extending platform.
2)
Push the guard rail of extending platform to extend the later to the expected position.
△
!
Notice: do not stand on the extending platform when extending the platform.
48
Содержание S0507SDTCE10
Страница 5: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 1 Safety 1...
Страница 11: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 2 Legend 7...
Страница 12: ...Operation and Maintenance Manual of Aerial Work Platform 8...
Страница 14: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 3 Label 10...
Страница 15: ...Operation and Maintenance Manual of Aerial Work Platform 11...
Страница 16: ...Operation and Maintenance Manual of Aerial Work Platform 12...
Страница 18: ...Operation and Maintenance Manual of Aerial Work Platform 14...
Страница 19: ...Operation and Maintenance Manual of Aerial Work Platform 15...
Страница 21: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 4 Specification 17...
Страница 24: ...Operation and Maintenance Manual of Aerial Work Platform 20...
Страница 25: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 5 Controller 21...
Страница 37: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 6 Emergency operation 33...
Страница 40: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 7 Pre operation inspection 36...
Страница 43: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 8 Workstation inspection 39...
Страница 45: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 9 Function test 41...
Страница 49: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 10 Operation notice 45...
Страница 53: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 11 Transport and lifting instruction 49...
Страница 56: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 12 Maintenance 52...
Страница 76: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 13 Schematic diagram 72...
Страница 77: ...Operation and Maintenance Manual of Aerial Work Platform Electric schematic diagram 73...
Страница 78: ...Operation and Maintenance Manual of Aerial Work Platform Hydraulic schematic diagram 74...