Operation and Maintenance Manual of Aerial Work Platform
△
!
11.1
Compliance and obedience
1)
When lifting the machine with a crane, please make the correct judgment and make a plan to
control the displacement of machine.
2)
Only the staff with the aerial lifting qualification is allowed to load and unload the machine.
3)
The carrier vehicle must be parked on a level ground.
4)
When loading the machine, be sure to fix the carrier vehicle, for fear of movement.
5)
Ensure that vehicle volume, loading surface, chain or belt is sufficient to bear the machine weight.
Please refer to the nameplate for the machine weight.
6)
Be sure to place the machine on the horizontal plane or fix the machine before releasing the brake.
7)
Takes measures to prevent the guard rail from falling when removing the bolt. Tightly hold the
guard rail when folding the guard rail.
8)
Do not drive the machine when climbing up and down a slope or when driving on a slope with
overproof gradient. For “Slope driving”, refer to the “Operation notice”.
9)
If the gradient of carrier vehicle exceeds the maximum gradient rating, be sure to load and unload
the machine with a winch as per the instruction for brake releasing operation.
11.2
Transport safety
1)
Please lock the machine wheels when
preparing the transport.
2)
Retract and fix the extending platform.
3)
Switch the key switch to the “OFF” position
and take off the key before the transportation.
4) The front and rear wheel with wedge blocks are
respectively fixed and comprehensive inspection
machine to prevent loose or loose parts.
5) Fix the machine on the transport surface via the
anchorage part on the chassis.
6)
Use at least four chains or belts.
7)
Be sure to use used chains or belts of sufficient load density.
8)
Please fix the folded guard rail (if any) with a belt before the transport.
Compliance and obedience
1)
Only the qualified hooker operator is allowed to assemble the lock and lift the machine.
2)
Only the staff with the forklift operation qualification is allowed to load and unload the machine with
a forklift.
3)
Ensure that the lifting capacity, loading surface, belt or rope of the crane is sufficient to bear the
machine weight. For serial number, please refer to the nameplate.
11.3
Forklift
1)
Be sure to safely and reliably fix the extending platform,
the controller and the chassis tray. Remove all movable
components from the machine.
2) Please completely lower the platform. Keep the platform
folded in each transport process.
50
Содержание S0507SDTCE10
Страница 5: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 1 Safety 1...
Страница 11: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 2 Legend 7...
Страница 12: ...Operation and Maintenance Manual of Aerial Work Platform 8...
Страница 14: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 3 Label 10...
Страница 15: ...Operation and Maintenance Manual of Aerial Work Platform 11...
Страница 16: ...Operation and Maintenance Manual of Aerial Work Platform 12...
Страница 18: ...Operation and Maintenance Manual of Aerial Work Platform 14...
Страница 19: ...Operation and Maintenance Manual of Aerial Work Platform 15...
Страница 21: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 4 Specification 17...
Страница 24: ...Operation and Maintenance Manual of Aerial Work Platform 20...
Страница 25: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 5 Controller 21...
Страница 37: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 6 Emergency operation 33...
Страница 40: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 7 Pre operation inspection 36...
Страница 43: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 8 Workstation inspection 39...
Страница 45: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 9 Function test 41...
Страница 49: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 10 Operation notice 45...
Страница 53: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 11 Transport and lifting instruction 49...
Страница 56: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 12 Maintenance 52...
Страница 76: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 13 Schematic diagram 72...
Страница 77: ...Operation and Maintenance Manual of Aerial Work Platform Electric schematic diagram 73...
Страница 78: ...Operation and Maintenance Manual of Aerial Work Platform Hydraulic schematic diagram 74...