AC Module System Installation Manual
Rev. 1.0
After completing the installation of AC modules on the rooftop or other site, next step is to install the communication
gateway(EnerBox2) which enables home owners and installers to monitor power production of individual AC module or
the entire array on a daily, monthly or an annual basis. The communication system is simple to connect the gateway with
AC modules and an internet router. Power Line Communication (PLC) method facilitates communication between the
gateway and AC modules. Then the gateway collecting energy and performance data from the AC modules in real time
transmits the accumulated log data to a web server through an internet router.
4-1 EnerBox2 Components
2. EnerBox2 left-side
3. EnerBox2 bottom-side
4. EnerBox2 Power-cable
5. LAN cable
48
1. EnerBox2 Front-side
Internet Router
EnerBox2
LG EnerVu for Professionals or for Owner
on a smart phone
LG EnerVu for Professionals or for Owner
on a desktop or laptop
4-2 Simple Diagram for Communication System Configuration
Power
Production
LED
Wi-Fi Antenna
Copyright © 2017 LG Electronics.
All Rights Reserved.
6. Wall mount bracket
7. Wall mount bracket screws