First Check
GA10.218_1.01 - 11/2004
⏐
27
3 First Operation
Check
The steps for an initial operation are described in this chapter. It is explai-
ned how to switch on the PhoeniX, how to measure and how to carry out
an internal calibration.
If anything unexpected happens during the initial operation or the leak
detector acts in a strange way the PhoeniX can be switched off by the
mains switch at any time.
3.1 Needed Equipment
The following parts will be needed:
• A blind flange 25 KF (if not preassembled at the inlet port).
• A helium test leak with a DN 25 KF adapter (optional).
• A forevacuum pump (dry or wet version) for use with the PhoeniXL300
Module
3.2 Description of the Initial Ope-
ration
Please proceed the following description step by step to start the initial
operation. Refer to Chapter
for a more detailed description.
3.2.1 Startup and Measure
1. Unpack the PhoeniX and inspect it for any external damage (Refer to
Chapter
).
2. Connect the instrument to the mains power (Refer to Chapter
For the PhoeniXL300 Modul connect the forevacuum pump and switch
it on.
3. Switch on the leak detector by using the mains switch
/4.
Содержание PhoeniXL300
Страница 18: ...General Information 18 GA10 218_1 01 11 2004 ...
Страница 30: ...Operation Check 30 GA10 218_1 01 11 2004 ...
Страница 44: ...Working Principle 44 GA10 218_1 01 11 2004 ...
Страница 48: ...Operation 48 GA10 218_1 01 11 2004 refer to Chapter 6 2 1 Scale linear logarithmic Fig 15 Display Trend Mode ...
Страница 82: ...Menu 82 GA10 218_1 01 11 2004 ...
Страница 86: ...Calibration 86 GA10 218_1 01 11 2004 ...
Страница 98: ...Maintenance 98 GA10 218_1 01 11 2004 ...
Страница 101: ......