background image

Page 23

Troubleshooting:  Blower Control Operating Sequence

Action

System Response

Thermostat calls for heat. 
(W terminal is energized.)

ST9103A closes oil primary control TR−TW contacts.

Ignition system and oil primary control start the furnace. Oil flows as long as cad cell
senses flame.

Call for heat energizes burner motor and blower ramping begins for heating mode. When
ramping is complete, the indoor blower is energized at heat speed and warm air is delivered
to the controlled space.

Thermostat ends call for heat. 
(W terminal is de−energized.)

Oil primary control is de−energized, terminating the burner cycle.

Heat fan off delay timing begins. When timing is complete, the indoor blower is de−ener-
gized.

ST9103A returns to standby mode (oil primary control and circulating fan are off).

Burner fails to light.

Oil primary control locks out within lockout timing (timing depends on oil primary control).

Burner motor is de−energized.

If heat fan has started, it continues through the selected delay off period.

Established flame fails.

Burner motor is de−energized and oil primary control goes into recycle mode.

If selected heat fan off delay is longer than the recycle delay timing, the heat fan continues
to run through the next trial for ignition.

Thermostat begins call for cool. 
(G and Y terminals are energized.)

Indoor blower is energized at the cool speed.

Cooling compressor turns on immediately.

Thermostat ends call for cool. 
(G and Y terminals are de−energized.)

Cooling compressor turns off immediately and indoor blower speed ramps down. Circulat-
ing fan shuts off after 60 seconds.

Thermostat begins call for fan. 
(G terminal is energized.)

Indoor blower is energized immediately at 50% of cool speed.

ST9103A may be factory−configured to operate heat speed in this mode.

Thermostat ends call for fan. 
(G terminal is de−energized.)

Indoor blower is de−energized.

Limit switch string opens.

Oil primary control shuts off the burner.

Indoor blower is energized immediately at heat speed.

ST9103A opens oil primary control TR−TW contacts.

Indoor blower runs as long as limit string stays open.

If there is a call for cooling or fan, the indoor blower switches from heat speed to cool
speed.

Limit switch string closes.

ST9103A begins heat fan off delay sequence.

Indoor blower turns off after the selected heat fan off delay timing.

ST9103A closes oil primary control TR−TW contacts.

Oil primary control is energized, initiating burner ignition.

Continuous circulating fan is connected. 
(Optional connectors are available for separate circulat-
ing fan speed tap.)

Indoor blower is energized at 50% of cool speed when there is no call for heat, cool or fan.

If fan operation is required by a call for heat, cool, or fan, the ST9103A switches off the
continuous fan speed tap before energizing the other fan speed.

IAQ accessory is connected. 
(Optional connectors are available for 120 Vac acces-
sories.)

EAC terminals (for IAQ accessories) are energized when the  indoor blower is energized in
either the heat or cool speed. EAC terminals are 

not 

energized when the optional continu-

ous fan terminal is energized.

Humidity control is connected. 
(Optional connectors are available for 120 Vac humidifi-
er.)

Humidifier connections are energized when the burner motor is energized.

Содержание SLO183UFV Series

Страница 1: ...3UFV Unit Dimensions 2 SLO183UFV Unit Parts Arrangement 3 SLO183UFV Oil Burner Parts Arrangement 3 Requirements 4 Combustion Ventilation Air 5 Locate Level the Unit 6 Adjustments 7 Venting 7 Flue Conn...

Страница 2: ...ELECTRICAL INLET Right Side Only OIL PIPING INLET Left Side Only OPT OUTDOOR COMBUSTION AIR INLET CENTERING HOLE Field Fabricate Right Side only RETURN AIR OPENING Either Side 3 4 19 A B C D AIR FLOW...

Страница 3: ...MIT SWITCH INDOOR BLOWER CAPACITOR BLOWER CONTROL Figure 2 SLO183UFV AFG Burner Parts Arrangement ESCUTCHEON PLATE MAIN HOUSING HEAT SHIELD BURNER CONTROL with Reset Button OIL DELAY VALVE AIR TUBE WI...

Страница 4: ...the furnace burner IMPORTANT An opening to the outside for combustion air is strongly recommended especially in new homes Refer to table 1 or the unit rating plate for specific combustion air opening...

Страница 5: ...ed at the same time as the furnace much more air is required to ensure proper combustion and to prevent a down draft situation Insufficient amounts of air also cause incomplete combustion which can re...

Страница 6: ...same cross sec tional area as the free area of the openings to which they connect The minimum dimension of rectangular air ducts shall be no less than 3 76 mm In calculating free area the blocking ef...

Страница 7: ...spect the spark transformer leads also to ensure they are still attached to the electrodes The burner assembly is attached to the vestibule panel by three nuts Slots are provided in the mounting flang...

Страница 8: ...nts and should be consulted before installation of unit 2 The vent connector should be as short as possible to do the job 3 The vent connector should not be smaller than the outlet diameter of the ven...

Страница 9: ...operation remain con nected to the common venting system If venting system has been installed improperly the system must be cor rected as outlined in the previous section 1 Seal any unused openings i...

Страница 10: ...adiation shields should extend from the top of the unit to the top of the flue pipe NON COMBUSTIBLE SPACERS RADIATION SHIELDS SEE NOTE 1 7 178 mm min 12 305 mm min A A B SEE NOTE 3 SEE NOTE 2 Supply R...

Страница 11: ...2 12 mm OD Tubing 0 0 0 84 25 6 93 28 3 100 30 5 100 30 5 2 0 6 73 22 3 85 25 9 100 30 5 100 30 5 4 1 2 63 19 2 77 23 5 100 30 5 100 30 5 6 1 8 52 15 8 69 21 0 100 30 5 100 30 5 8 2 4 42 12 8 60 18 3...

Страница 12: ...ctory and field for oil leaks Oil Pipe Heater Optional A heater for the oil pipe is available for applications that are located in cold climates The heater warms the oil pipe to assist the initial sta...

Страница 13: ...Page 13 Figure 7 Typical SLO183UFV Wiring Diagram OIL DELAY A15 A54 9 1 ST9103A...

Страница 14: ...ams 1 Heat 1 Cool ComfortSense 7000 L7724U 1 Heat 2 Cool ComfortSense 7000 L7724U 1 Heat 1 Cool ComfortSense 7000 L7724U with Thermostat Dehumidification Mode 1 Heat 2 Cool ComfortSense 7000 L7724U wi...

Страница 15: ...ge Heat Pump ComfortSense 7000 L7724U with Dual Fuel Control Mode Dual Fuel Two Stage Heat Pump ComfortSense 7000 L7724U with Dual Fuel Control Mode Dual Fuel Two Stage Heat Pump ComfortSense 7000 L77...

Страница 16: ...of each cooling demand to allow for greater humidity removal and to conserve energy If after 7 1 2 minutes the Y demand is not met 100 CFM is supplied until the demand is satisfied OFF CALL 100 82 Y...

Страница 17: ...wer speed For example if the unit is operating at 1000 CFM the CFM LED will flash 10 times At times the light may appear to flicker or glow This takes place when the control is communicating with the...

Страница 18: ...5 NORM N A N A N A N A 1300 615 1200 565 1400 660 1200 565 1000 470 800 380 N A N A N A N A Same as NORM 1190 560 1020 480 850 400 680 320 Model SLO183UFV135 150 Units Do not use 150 Do not use 135 N...

Страница 19: ...rom picking up radiant heat Set thermostat to its highest setting to start unit After plenum thermometers have reached their highest and steadiest readings subtract the readings The difference in temp...

Страница 20: ...oosen the air band screw and rotate the band This is the starting point Do not stop here 4 CO2 Test Again take this sample at the vent pipe With the unit firing at a trace of smoke take a sample of th...

Страница 21: ...ps from the clean out tubes Remove flue access elbow 3 Using a long spiral wire brush sweep down the outer drum of the heat exchanger Then using the hose at tachment vacuum out loose debris 4 Remove t...

Страница 22: ...nal is de energized Response D After the thermostat is satisfied the thermostat circuit opens The oil delay valve and burner are de energized D Burner is de energized D Heat fan off ramp timing begins...

Страница 23: ...peed ramps down Circulat ing fan shuts off after 60 seconds Thermostat begins call for fan G terminal is energized Indoor blower is energized immediately at 50 of cool speed ST9103A may be factory con...

Страница 24: ...ect the flame detector wires at the primary control If the burner starts fault is in the detector circuit Flame detector leads are shorted Separate leads Flame detector exposed to light Seal off false...

Страница 25: ...from unit Inspect the nozzle for plugged orifice or carbon build up around orifice Nozzle orifice plugged Replace nozzle with the same size spray angle and spray pattern Nozzle strainer plugged Poor o...

Страница 26: ...ter burner fires immedi ately jumper across flame detector termi nals at the pri mary control If burner con tinues to run does not lock out of safety fault may be due to poor fire Inspect fire Unbalan...

Страница 27: ...wheel dirty Clean blower wheel Wrong motor rotation Replace motor Restrictions in return or supply air system Correct cause of restriction Power If voltage fluctuates fault is in the power source Rech...

Страница 28: ...d heat exchanger Clean heat exchanger Readjust burner Insufficient overfire draft Increase draft Incorrect nozzle assembly depth Set to 1 13 Too little combustion air Increase combustion air High stac...

Отзывы: