Operating Manual Leica EM ACE600
Version 01/19
Page 20
Lift out the unit by grasping underneath the back and the front as indicated in the
picture (packaging provides recess for hands) and place it on a table.
Two strong people are required to lift the coater!
Place the Leica EM ACE600 on a stable bench.
Adjusted all feet and counter lock (flat spanner 13 mm) to maintain level and
stable positioning. Connect mains cable.
If venting with nitrogen gas, connect to nitrogen gas (supplied hose, 6 mm
diameter). Regulate nitrogen pressure to ~0.5 bar over atmosphere.
Содержание EM ACE600
Страница 1: ...From Eye to Insight OPERATING MANUAL EM ACE600 167202032 Version 01 19 ...
Страница 4: ......
Страница 8: ......
Страница 81: ...Operating Manual Leica EM ACE600 Version 01 19 Page 76 ...
Страница 132: ...Leica Mikrosysteme GmbH Vienna Austria T 43 1 486 8050 0 F 43 1 486 8050 30 www leica microsystems com CONNECT WITH US ...