
Service Manual JET3
136
Rev. 1.0
13. Close the gutter tube with the button
<Close Nozzle>
(1), switch the
<Ink on>
(2) and
activate the
<Ink-Flow-Sensor>
(3).
1
– Button <Close Nozzle>
2
– Button <Ink on>
3
– Button <Ink Flow Sensor>
14. Bring the drop production unit into the print position. Then install the inner cover and
tighten it. Don
’t smash or brake any cables and pipes during this action.
15.
Check the jet for the right position in the gutter and the electrodes.
1
2
3
Pull the allen key carefully out of
the bearing block again.
Содержание JET3 up
Страница 1: ...SERVICE MANUAL ...
Страница 12: ...Service Manual JET3 12 Rev 1 0 2 4 Safety sticker Figure 1 ...
Страница 58: ...Service Manual JET3 58 Rev 1 0 7 2 Documentations for SK4 Torsional moments for SK4 ...
Страница 99: ...Service Manual JET3 Rev 1 0 99 7 3 Documentations for SK6 Torsional moments for SK6 ...
Страница 142: ...Service Manual JET3 142 Rev 1 0 ...
Страница 144: ...Service Manual JET3 144 Rev 1 0 7 4 Hydraulic 1 Hydraulic scematic ...