Service Manual JET3
Rev. 1.0
111
6. Adjust the Ink stream just like in the sketch below (view from nozzle to gutter tube) by
adjusting the nozzle retainer and fix the screws again.
7. After the Ink stream adjustment you need to adjust the entire drop production unit in
the charging tunnel and deflecting plates. So that the Ink stream passes parallel and
with level of the inner edge of the charging tunnel (watch sketch below, arrow from
nozzle to gutter tube). To avoid parallax faults you need to point your perspective
exactly vertical to the charging tunnel.
inner edge of the charging tunnel
8. To adjust the drop production unit you need to unfix the five attachment screws of the
fixing plate. Just so far that you can adjust the unit manhandling. After adjusting the
unit fix the attachment screws again and control the position of the Ink stream.
Ink stream position in gutter tube
Attachment screws
Содержание JET3 up
Страница 1: ...SERVICE MANUAL ...
Страница 12: ...Service Manual JET3 12 Rev 1 0 2 4 Safety sticker Figure 1 ...
Страница 58: ...Service Manual JET3 58 Rev 1 0 7 2 Documentations for SK4 Torsional moments for SK4 ...
Страница 99: ...Service Manual JET3 Rev 1 0 99 7 3 Documentations for SK6 Torsional moments for SK6 ...
Страница 142: ...Service Manual JET3 142 Rev 1 0 ...
Страница 144: ...Service Manual JET3 144 Rev 1 0 7 4 Hydraulic 1 Hydraulic scematic ...