Power Foundations Owners Manual 99300787-k
10
NOTE: If bed is to be set up without a headboard, basic
installation is now complete. If headboard is to be
installed, proceed to Headboard Bracket Installation.
b. Place mattress retainer ends into grommeted holes in top surface of
adjustable bed base (FIGURES 5 and 6). Press down until horizontal
retainer section is flush against bed base.
figure 5: mattress retainer installation.
figure 6: mattress retainer installed.
mattress
retainer
foo
t end of bed base
iNStALLAtiON