Power Foundations Owners Manual 99300787-k
17
iNStALLAtiON
h. When installing a headboard, footboard, or four-piece surround (case good),
allow for 1.5 inches (38.1mm) to 2 inches (50.8mm) of clearance at the
head and foot of the bed and a minimum of ½ inch to ¾ inch on the sides
(FIGURE 16).
i. Firmly tighten the 3 inch carriage bolts of both headboard bracket channels.
j. Measure the center-to-center distance between the mounting slots of the
headboard bracket flanges (FIGURE 17).
k. If bracket flange adjustment is required to accept the headboard, remove the
1 inch long hex head bolts and move flanges side-to-side for the adjustment
(FIGURE 17). Reinstall bolts. Tighten all headboard mounting bolts.
l. Install headboard.
Typical Power Foundation
installation is now complete. If bed is equipped
with programmable settings or options, refer to the
Hand Control Guide
for
programming information.
StEP 12
Install mattress on bed base.
measure flange slots
center-to-center to check
headboard hole location
remove 1 inch long heX head bolts and relocate
flanges to achieve center-to-center distance
reQuired for headboard mounting holes
figure 17: headboard bracket measurement and adjustment to accept headboard.
NOTE
twin size headboard bracket assemblies are
shown (figures 16 and 17). Queen size headboard
brackets are eQuipped with angle braces.