Power Foundations Owners Manual 99300787-k
9
StEP 6
Remove the plastic packaging from the bed base frame. Carefully rotate the
base frame over to position the bed top-side-up.
StEP 7
Plug electrical power cord into a working, grounded electrical outlet.
Note: an electrical surge protection device is recommended (not included).
StEP 8
If hand control is non-wired type, install batteries in hand control (wired
hand controls do not require batteries). Briefly activate all functions of the
bed with the hand control to verify all features are in working order. If bed
does not operate, refer to the
Troubleshooting
section of this manual.
StEP 9
Return bed to the level position.
StEP 10
Install mattress retainer at the foot end of the bed base as follows:
a. Locate grommeted holes at foot of bed base (FIGURE 4).
grommeted
holes
figure 4: grommeted hole locations.
foo
t end of bed base
iNStALLAtiON