Installation and Getting Started
2-12
D850R3
User’s Manual Switchos
i)
Set the purge flow to 0.5 mL/min. Allow the system to purge for at least 3
min. After line A has been purged, repeat the process for all other lines.
j)
Close the purge valve on the loading pump by turning the purge valve knob
clockwise.
k)
Close the He shut-off valve(s) on top of the solvent bottles that will not be
used (the white line should be horizontal).
l)
Place the loading pump under computer control and deliver mobile phase
through the entire HPLC system at the flow rate and from the solvent
reservoir that are used for the initial conditions for the analysis that you
intend to perform. As the system is delivering mobile phase, check for leaks,
monitor the baseline and check that the pressure is similar to what was
observed when the system was last used.
2.6.4
Setting-up the Fluidic Connections
The Switchos is used in a broad range of applications and the user can configure
the unit to meet the specific needs of the laboratory. In this section we show the
fluidic setup of a pre-concentration application using the Switchos Advanced
Microcolumn Switching Unit in conjunction with the FAMOS Microautosampler
and the UltiMate Capillary HPLC System (FIGURE 2-12). Additional examples are
presented in Appendix C. While these examples may not meet the specific needs
of the analyst, it is likely that they can be used with minor modification.
Pre-Concentration using the Switchos and the FAMOS Microautosampler
Micro flow
from UltiMate
Waste
FAMOS
port 1
FAMOS
port 6
Valve A
presented
in position
1-2
Micro flow
to UltiMate
Analytical microcolumn
Trap column
1
2
3
4
5
6
7
8
9
10
Switchos
Waste
Valve A
FIGURE 2-12 Typical Pre-Concentration Setup (Loading the Trap Column)
To setup the Switchos for the pre-concentration application presented in FIGURE
2-12, connect the instruments as follows:
a)
Connect port 1 of the injection valve of the FAMOS Microautosampler to the
Nano/Micro flow outlet of the Switchos loading pump using the 130
µ
m I.D.
PEEK tubing provided with the instrument:
Содержание SWITCHOS II
Страница 1: ...D850R3 www lcpackings com Switchos II Advanced Microcolumn Switching Unit User s Manual P N 162013...
Страница 6: ...Table of Contents iv D850R3 User s Manual Switchos II This page intentionally left blank...
Страница 10: ...Instructions for Returning Instruments viii D850R3 User s Manual Switchos II This page intentionally left blank...
Страница 14: ...CE Declaration xii D850R3 User s Manual Switchos II This page intentionally left blank...
Страница 22: ...Introduction 1 8 D850R3 User s Manual Switchos II This page intentionally left blank...
Страница 80: ...The Switching Valves A 4 D850R3 User s Manual Switchos II This page intentionally left blank...
Страница 82: ...Network Identification B 2 D850R3 User s Manual Switchos II This page intentionally left blank...