
19
NOVA MIX 2K
English
500-700 mm
Once this purging phase has been completed, the operator can
proceed with normal working operations.
PROCEDURE FOR CHECKING COMPONENT
DOSAGE
These mixing blocks have been designed to allow the operator
using the
LARIUS NOVA MIX 2K
to check that the mixing ratio
of the two components is correct.
The operator must perform the following procedure in order to
check the quantities of the two components just before they are
mixed:
• Mount the component tapping blocks (
G18
).
• Open the valves (
G19
) and set the tapping cycle in order to
check the dosage of the components.
The machine must not be pressurized.
• By positioning the 2 containers (
G20
) in correspondence
to the 2 outlets, the operator can check the actual amounts
dispensed by the machine.
During the normal tapping phase, the valves (G19)
must always be open.
During the normal working phase, the two blocks
(G18) must not be mounted.
G18
G19
G20
G16
G17