3-5 HYDRAULIC LIFT ASSEMBLY - RIGID MODELS
DANGER
TO PREVENT ACCIDENTAL LOWER-
ING OF EQUIPMENT, ALL HYDRAULI-
CALLY ELEVATED EQUIPMENT MUST
BE LOCKED OUT USING THE CYLIN-
DER LOCKOUTS OR LOWERED TO
THE GROUND DURING SERVICING OR
WHEN EQUIPMENT IS IDLE. FAILURE
TO TAKE PREVENTATIVE MEASURES
AGAINST ACCIDENTAL LOWERING
CAN RESULT IN SERIOUS PERSONAL
INJURY OR DEATH.
3-5.1
Unscrew yoke from master cylinder piston
rod, except on 13 shank machines. Install
stroke control cover and stroke control on
cylinder piston rod. Replace cylinder yoke,
adjust extended length to 28-1/4" from hole
center to hole center by threading yoke on
piston rod proper distance. Tighten set screw
to lock yoke in place
(See Figure 3-5)
.
3-5.2
On 13 shank units, adjust extended cylin-
der length to 28-1/4" from center of pin
holes. Tighten set screw to lock yoke in
place. Cylinder stops are used on the 13
shank Soil Master II.
3-5.3
Install cylinders with ports up on frame.
Connect yoke to gauge wheel arm using cyl-
inder lockouts, extended cylinder pin, and
hair pin cotters. Connect anchor end to main
frame with extended cylinder pin and hair pin
cotters
3-5.4
On 13 shank units, lock out for 2" rod must
be on larger cylinder (master).
3-5.5
Install hydraulic lines as shown in
Table
and
Figure 3-5.
Use 90
o
elbows in cylin-
der ports.
3-9
Содержание SOIL MASTER II 1200 Series
Страница 3: ...MODEL 1200 SERIES SOIL MASTER II OPERATOR S MANUAL PURCHASED FROM DATE ADDRESS PHONE NO SERIAL NO...
Страница 7: ......
Страница 11: ...2 4 Figure 2 1 Rigid 7 9 Shank Spacing...
Страница 12: ...2 5 Figure 2 2 Rigid 11 Shank Spacing...
Страница 13: ...2 6 Figure 2 3 Rigid 13 Shank Spacing...
Страница 14: ...2 7 Figure 2 4 Wing 15 Shank Spacing...
Страница 15: ...2 8 Figure 2 5 Wing 17 Shank Spacing...
Страница 16: ...2 9 Figure 2 6 Wing 19 Shank Spacing...
Страница 17: ...NOTES 2 10...
Страница 19: ...3 2 Figure 3 1 Frame Assembly Rigid...
Страница 21: ...3 4 Figure 3 2 Frame Assembly Folding...
Страница 29: ...3 12 Figure 3 7 Hydraulic Fold Assembly...
Страница 31: ...3 14 Figure 3 8 Pull Hitch Installation...
Страница 33: ...3 16 Figure 3 9 Coulter Gang Installation...
Страница 34: ...3 17 Figure 3 10 Coulter Depth Adjustment...
Страница 35: ...3 18 Figure 3 11 Coulter Gang Hydraulic Assembly...
Страница 37: ...3 20 Figure 3 12 Clamp Assemblies...
Страница 39: ...3 22 Figure 3 13 Electrical Installation...
Страница 41: ...3 24 Figure 3 14 1200 Series Decal Placement 1 of 2...
Страница 42: ...3 25 Figure 3 15 1200 Series Decal Placement 2 of 2...
Страница 51: ......
Страница 53: ...NOTES 5 3...
Страница 54: ......