LAMBRECHT meteo GmbH
Ser[LOG] Manual
Page 82 of 129
It applies:
1. Switch-on time = cycle time minus lead time span
2. Deactivation time = cycle time plus delay time span
3. Duration of the switching process = flow + run-on time
Note:
In order to exclude simultaneous switching on and off (time span = 0), the entered numerical
values in the two fields "Forward" and "After-run" must not be 00:00:00 at the same time!
Example of a combination of process control and cycle control
In the example above, relay 1 switches on every minute for 20 seconds (10 seconds a 10
seconds follow-up) from 7:00 to 17:00.
Содержание Ser[LOG]
Страница 9: ...LAMBRECHT meteo GmbH Ser LOG Manual Page 9 of 129 21 Technical data 127 22 Disposal 129...
Страница 68: ...LAMBRECHT meteo GmbH Ser LOG Manual Page 68 of 129 This choice leads to the following graph...
Страница 92: ...LAMBRECHT meteo GmbH Ser LOG Manual Page 92 of 129 12 Managing the safety settings...
Страница 101: ...LAMBRECHT meteo GmbH Ser LOG Manual Page 101 of 129...
Страница 102: ...LAMBRECHT meteo GmbH Ser LOG Manual Page 102 of 129...
Страница 103: ...LAMBRECHT meteo GmbH Ser LOG Manual Page 103 of 129...
Страница 104: ...LAMBRECHT meteo GmbH Ser LOG Manual Page 104 of 129...
Страница 105: ...LAMBRECHT meteo GmbH Ser LOG Manual Page 105 of 129...
Страница 106: ...LAMBRECHT meteo GmbH Ser LOG Manual Page 106 of 129...
Страница 107: ...LAMBRECHT meteo GmbH Ser LOG Manual Page 107 of 129...