15
Very little assembly and setup is required, as the machine comes fully assembled. You
will have to fit the sanding belt and connect the air and electricity.
Cleaning the machine
Remove the rust protection grease with WD 40 or a similar solvent. It is important that
you remove all the grease.
Connecting the dust collection
There are 5-
inch dust
ports on the
top of the
machine.
Depending
on the
machine, it
will either
have two or
three ports. It
is not
possible to
be exact when recommending the size of the dust collector to be connected to the
sander, as this will depend on the type of work that you will be using the sander for.
Connect to your dust collector with 5-inch dust hose. You will need a dust-collection
system with a minimum airflow of 65 feet per second and of 3500 cubic feet/minute. The
sander produces a lot of dust, and the stronger the dust collection the better.
Connecting the electrical supply
Note.
A qualified electrician
must carry out the
installation.
Ensure that the main supply
corresponds with that of the
machine (three-phase 220 V
or single phase 220V).
It is recommended that you
use a 70-amp mains breaker
for single phase machine and
30 amp breaker for three
phase machine.
Due to the high amp draw of
this machine, it is
recommended that the
machine be wired directly into
the electrical distribution system.
5-inch dust port
5-inch dust port
Electrical termination block
Mains gland
Assembly and Setup
Содержание MSANWB25X60-1K-7.5-0197
Страница 2: ......
Страница 7: ...7 Specification Sheet for Widebelt Sander...
Страница 38: ...38 Electrical Drawing...
Страница 39: ...39 Electrical Drawing...
Страница 40: ...40 Exploded View Drawings...
Страница 42: ...42...
Страница 44: ...44...
Страница 46: ...46...
Страница 48: ...48...
Страница 50: ...50...
Страница 52: ...52...
Страница 54: ...54...
Страница 56: ...56...
Страница 58: ...58...
Страница 60: ...60...