Rigging procedures
5.
Put the M-BUMP onto SB18#1 by keeping the orientation and attach the four rigging arms of SB18#1 to the M-BUMP
as follows: disconnect a T-BLP from SB18#1, rotate the rigging arm up, re-connect the T-BLP to the M-BUMP rigging
point and the rigging arm ; repeat this procedure until all 4 arms are secured.
6.
Attach the motor hook(s) or stinger(s) to the shackle(s).
7.
Raise the array so that it is possible to place another stack of two SB18 under it.
Kara owner's manual (EN) version 1.0
71
Содержание LA-RAK
Страница 1: ...Kara owner s manual EN ...
Страница 5: ...APPENDIX D Safety pin removal and insertion 199 APPENDIX E Recommendation for speaker cables 200 5 ...
Страница 148: ...Corrective maintenance 5 Secure the handle 5 mm 5 N m 148 Kara owner s manual EN version 1 0 ...
Страница 179: ...Speci cations SB18 dimensions 750 mm 29 5 in 707 mm 27 8 in 553 mm 21 8 in Kara owner s manual EN version 1 0 179 ...
Страница 181: ...Speci cations SB28 dimensions 700 mm 27 6 in 1300 mm 51 2 in 550 mm 21 7 in Kara owner s manual EN version 1 0 181 ...
Страница 201: ...L Acoustics 13 rue Levacher Cintrat 91460 Marcoussis France 33 1 69 63 69 63 info l acoustics com www l acoustics com ...