Rigging procedures
c) Secure the link arm to SB18#1 by re-inserting the T-BLP into the SB18#1 top link point.
d) Repeat this procedure until all four arms are secured to SB18#1.
4.
(p.122) and
(p.122) until all SB18 composing the array are assembled.
5.
Assemble a KARA-MINIBU/KARA-MINIBUEX stacking platform as follows:
a) Turn the KARA-MINIBU so that the text of the identication plate is upside down.
b) Position a rst KARA-MINIBUEX on the laser plate side of the KARA-MINIBU by turning it feet pointing down and
inserting the stud into the slit of the KARA-MINIBU located near the laser plate.
c) Drive 3 bolts to the 3 holes shown in the gure below (6 mm hex bit, 13 mm hex key, 7 N.m/63 in.lb f ).
d) Repeat the procedure with a second KARA-MINIBUEX on the other side of the KARA-MINIBU.
Put the stacking platform in rear extension conguration only (see
Stacking platform conguration
(p.197)).
Kara owner's manual (EN) version 1.0
123
Содержание LA-RAK
Страница 1: ...Kara owner s manual EN ...
Страница 5: ...APPENDIX D Safety pin removal and insertion 199 APPENDIX E Recommendation for speaker cables 200 5 ...
Страница 148: ...Corrective maintenance 5 Secure the handle 5 mm 5 N m 148 Kara owner s manual EN version 1 0 ...
Страница 179: ...Speci cations SB18 dimensions 750 mm 29 5 in 707 mm 27 8 in 553 mm 21 8 in Kara owner s manual EN version 1 0 179 ...
Страница 181: ...Speci cations SB28 dimensions 700 mm 27 6 in 1300 mm 51 2 in 550 mm 21 7 in Kara owner s manual EN version 1 0 181 ...
Страница 201: ...L Acoustics 13 rue Levacher Cintrat 91460 Marcoussis France 33 1 69 63 69 63 info l acoustics com www l acoustics com ...