Rigging procedures
2.
(Optional, see
(p.189)) Install one or two M-BAR on the M-BUMP as follows (repeat for
each M-BAR):
a) Remove both T-BLP from the M-BAR.
b) Insert both M-BAR studs face to the desired M-BUMP holes.
c) Secure by inserting both preceding T-BLP through M-BAR studs and M-BUMP holes.
b.
c.
3.
Attach the shackle(s) to the M-BUMP (see
Safety pin removal and insertion
(p.199)) according to the desired
conguration (see
(p.189)).
4.
Place a full ight-case at the rigging location and remove the lid. Direct the front face of the 3-Kara array towards
the audience. In the following, the array will be designated as ARRAY#1 and the enclosures as KARA#1 to KARA#3
from top to bottom.
5.
Check the inter-enclosure connections in ARRAY#1 (repeat for each side):
a) For both front rigging points, verify that the front arm is open and locked to 2 Kara by 2 R-BLP inserted in yellow
link holes.
b) For both rear rigging points, verify that the angle arm cursor is aligned with the 0° angle value and locked to
2 Kara by 2 R-BLP, the upper one inserted in a yellow link hole and the bottom one inserted into angle hole
0°/2°/4°.
Kara owner's manual (EN) version 1.0
51
Содержание LA-RAK
Страница 1: ...Kara owner s manual EN ...
Страница 5: ...APPENDIX D Safety pin removal and insertion 199 APPENDIX E Recommendation for speaker cables 200 5 ...
Страница 148: ...Corrective maintenance 5 Secure the handle 5 mm 5 N m 148 Kara owner s manual EN version 1 0 ...
Страница 179: ...Speci cations SB18 dimensions 750 mm 29 5 in 707 mm 27 8 in 553 mm 21 8 in Kara owner s manual EN version 1 0 179 ...
Страница 181: ...Speci cations SB28 dimensions 700 mm 27 6 in 1300 mm 51 2 in 550 mm 21 7 in Kara owner s manual EN version 1 0 181 ...
Страница 201: ...L Acoustics 13 rue Levacher Cintrat 91460 Marcoussis France 33 1 69 63 69 63 info l acoustics com www l acoustics com ...