Rigging procedures
8.
Remove the four KARA#1 bottom R-BLP from their
link
holes and re-insert them into their
storage
holes.
9.
Hold the KARA#1/platform assembly, turn it feet downwards and front face towards audience, and put it on the
ground.
10.
Open the four KARA#2 arms by applying step
(p.104).
11.
Remove the four KARA#2 bottom R-BLP from their
link
holes and re-insert them into their
storage
holes (see step
(p.106)).
106
Kara owner's manual (EN) version 1.0
Содержание LA-RAK
Страница 1: ...Kara owner s manual EN ...
Страница 5: ...APPENDIX D Safety pin removal and insertion 199 APPENDIX E Recommendation for speaker cables 200 5 ...
Страница 148: ...Corrective maintenance 5 Secure the handle 5 mm 5 N m 148 Kara owner s manual EN version 1 0 ...
Страница 179: ...Speci cations SB18 dimensions 750 mm 29 5 in 707 mm 27 8 in 553 mm 21 8 in Kara owner s manual EN version 1 0 179 ...
Страница 181: ...Speci cations SB28 dimensions 700 mm 27 6 in 1300 mm 51 2 in 550 mm 21 7 in Kara owner s manual EN version 1 0 181 ...
Страница 201: ...L Acoustics 13 rue Levacher Cintrat 91460 Marcoussis France 33 1 69 63 69 63 info l acoustics com www l acoustics com ...