Rigging procedures
8.
Lower the array until ARRAY#2 rests in the tray and the front link points between ARRAY#2 and ARRAY#1 are in
contact.
9.
Disconnect the front link points between ARRAY#1 and ARRAY#2 as follows:
a) Remove both KARA#4 front top R-BLP from their
link
holes.
b) Slightly raise ARRAY#1 so that it is no longer in contact with ARRAY#2.
c) Remove both KARA#3 front bottom R-BLP from their
link
holes and re-insert them into their
storage
holes.
d) Rotate both KARA#4 front arms down and re-insert both front top R-BLP into their
storage
holes.
The front top
storage
and
link
holes are the same.
10.
Remove ARRAY#2 from the rigging location and attach the lid to the ight-case.
11.
Lower the array to a height for which the angle arms of ARRAY#1 are within comfortable reach and set the angles to
0° by applying step
(p.66).
12.
Bring another empty ight-case to the rigging location, remove the lid, and place the tray beneath ARRAY#1.
Pay attention to the tray position: both wedges must slope upwards from front to rear (refer to
(p.25)).
13.
Lower ARRAY#1 into the tray. Lower the motor chain(s) so as to release tension.
Kara owner's manual (EN) version 1.0
67
Содержание LA-RAK
Страница 1: ...Kara owner s manual EN ...
Страница 5: ...APPENDIX D Safety pin removal and insertion 199 APPENDIX E Recommendation for speaker cables 200 5 ...
Страница 148: ...Corrective maintenance 5 Secure the handle 5 mm 5 N m 148 Kara owner s manual EN version 1 0 ...
Страница 179: ...Speci cations SB18 dimensions 750 mm 29 5 in 707 mm 27 8 in 553 mm 21 8 in Kara owner s manual EN version 1 0 179 ...
Страница 181: ...Speci cations SB28 dimensions 700 mm 27 6 in 1300 mm 51 2 in 550 mm 21 7 in Kara owner s manual EN version 1 0 181 ...
Страница 201: ...L Acoustics 13 rue Levacher Cintrat 91460 Marcoussis France 33 1 69 63 69 63 info l acoustics com www l acoustics com ...