Rigging procedures
12.
Close the four KARA#1 arms as follows (repeat on both sides of the enclosure):
a) Remove the front top R-BLP from its
link
hole, slide the front arm up, rotate it down, and lock it in place by re-
inserting the R-BLP into its
storage
hole.
The front top
storage
and
link
holes are the same.
b) Remove the rear top R-BLP from its angle hole, slide the angle arm so as to align the cursor with the storage label,
and lock it in place by re-inserting the R-BLP into its
storage
hole.
13.
Attach the lid to the ight-case.
14.
Remove the top SB18 (SB18#2 for example) from the SB18 below (SB18#1 for example) as follows:
a) Remove a top T-BLP from SB18#1.
b) Rotate the link arm up.
c) Lock the link arm in closed position by re-inserting the T-BLP into SB18#2.
d) Repeat this procedure until all four arms are locked in closed position.
15.
Attach a dolly board to SB18#2 and remove SB18#2 from the rigging location.
16.
(p.135) until all SB18 of the array are disassembled.
Kara owner's manual (EN) version 1.0
135
Содержание KARA
Страница 1: ...Kara owner s manual EN...
Страница 5: ...APPENDIX D Safety pin removal and insertion 199 APPENDIX E Recommendation for speaker cables 200 5...
Страница 148: ...Corrective maintenance 5 Secure the handle 5 mm 5 N m 148 Kara owner s manual EN version 1 0...
Страница 179: ...Speci cations SB18 dimensions 750 mm 29 5 in 707 mm 27 8 in 553 mm 21 8 in Kara owner s manual EN version 1 0 179...
Страница 181: ...Speci cations SB28 dimensions 700 mm 27 6 in 1300 mm 51 2 in 550 mm 21 7 in Kara owner s manual EN version 1 0 181...
Страница 201: ...L Acoustics 13 rue Levacher Cintrat 91460 Marcoussis France 33 1 69 63 69 63 info l acoustics com www l acoustics com...