Rigging procedures
Array mounting
About this task
All along the procedure:
Strictly follow the sequence of the successive steps.
Systematically verify that each BLP is fully inserted.
Systematically verify that each bolt is fully screwed in and secured with pin.
For clarity purposes the loudspeaker cabling procedure will not be described.
The loudspeaker cables will not be represented on the gures.
Procedure
1.
Place an M-BUMP at the rigging location. Turn it so that the text of the identication plate is upside down and the
laser slits are directed towards the audience.
2.
Mount two M-BAR/M-JACK assemblies as follows (repeat for each M-BAR):
a) Remove the safety pin (see
Safety pin removal and insertion
(p.199)) and the bolt from a shackle.
Alternatively, order KR MJACKAXE from L-Acoustics. The repair kit contains four sets of bolts and safety
pins.
b) Place an M-JACK under one end of an M-BAR and align the M-JACK hole with the second M-BAR hole.
c) Secure by inserting the preceding bolt and safety pin.
d) Repeat the procedure to attach a second M-JACK to the other end of the M-BAR.
Second hole
a.
b.
c.
d.
3.
According to the chosen conguration (see
Stacking platform conguration
(p.195)), mount the stacking platform as
follows (repeat for each M-BAR):
a) Remove both T-BLP from an M-BAR.
Kara owner's manual (EN) version 1.0
115
Содержание KARA
Страница 1: ...Kara owner s manual EN...
Страница 5: ...APPENDIX D Safety pin removal and insertion 199 APPENDIX E Recommendation for speaker cables 200 5...
Страница 148: ...Corrective maintenance 5 Secure the handle 5 mm 5 N m 148 Kara owner s manual EN version 1 0...
Страница 179: ...Speci cations SB18 dimensions 750 mm 29 5 in 707 mm 27 8 in 553 mm 21 8 in Kara owner s manual EN version 1 0 179...
Страница 181: ...Speci cations SB28 dimensions 700 mm 27 6 in 1300 mm 51 2 in 550 mm 21 7 in Kara owner s manual EN version 1 0 181...
Страница 201: ...L Acoustics 13 rue Levacher Cintrat 91460 Marcoussis France 33 1 69 63 69 63 info l acoustics com www l acoustics com...