Optional equipment
Precision Seed Drills
MAXIMA 2 M
157
Adjusting the spline opening
The spline opening is adjusted by means of crank (1).
Adjusting the distribution shaft rotational speed
- Loosen wing nut (1).
- Pivot tensioner (4).
- Remove spacer (2).
- Move the double gearwheel (3) and chain to the
required position:
• Position (a): Dristribution shaft speed of 13 revs for
a travel of 100 m (328’).
• Position (b): Dristribution shaft speed of 30 revs for
a travel of 100 m (328’).
- Reinstall wedge (2) according to double gearwheel (3)
position.
- Pivot tensioner (4).
- Tighten the wing nut (1).
Refer to adjustment chart to dermtermine the
spline opening adjustment index according to
the required application rate and the spacing
between the seed drill rows.
Refer to the adjustment chart to determine the
drive gearwheel direction of mount according to
the required application rate and the spacing
between the seed drill rows.
Содержание MAXIMA 2 M
Страница 2: ......
Страница 77: ...Instructions for work Precision Seed Drills MAXIMA 2 M 75 Adjustment of the gearbox Combination chart...
Страница 212: ...Precision Seed Drills 210 MAXIMA 2 M Appendix T Axle loads Tractor only...
Страница 214: ...Precision Seed Drills 212 MAXIMA 2 M Limited warranty Limited warranty...
Страница 215: ...Limited warranty Precision Seed Drills MAXIMA 2 M 213...
Страница 216: ......
Страница 217: ......
Страница 218: ......
Страница 219: ......
Страница 220: ......