Precision Seed Drills
42
MAXIMA 2 M
Putting into service
Electrical connection
- Connect 7-pin plug to the tractor.
- Connect control box wiring harness to the tractor 3-pin
socket.
After making the connections, check that there is no risk
of the cables being caught during operation.
Hydraulic connections
Connect hydraulic hoses (1) and (2) to a double acting
outlet.
Hoses (1) and (2) supply the side marker folding /
unfolding cylinders.
When optional equipment is used, follow
specific procedures mentioned in the related
section:
- Filling auger.
- Hydraulic blower drive.
Содержание MAXIMA 2 M
Страница 2: ......
Страница 77: ...Instructions for work Precision Seed Drills MAXIMA 2 M 75 Adjustment of the gearbox Combination chart...
Страница 212: ...Precision Seed Drills 210 MAXIMA 2 M Appendix T Axle loads Tractor only...
Страница 214: ...Precision Seed Drills 212 MAXIMA 2 M Limited warranty Limited warranty...
Страница 215: ...Limited warranty Precision Seed Drills MAXIMA 2 M 213...
Страница 216: ......
Страница 217: ......
Страница 218: ......
Страница 219: ......
Страница 220: ......