35
◆
Open the UPS door to easily access to the main power switch
;
◆
Switch OFF the input switch.
◆
Switch OFF
the OUTPUT switch.
The UPS shuts down
;
WARNING!
Wait for about 5 minutes for the internal D.C. bus bar capacitors to be
completely discharged
.
4.2.6
Startup procedure for parallel system
Connect parallel cable, input/output cable, and battery cable well; modify the parallel
board jumpers correctly.
Measure the positive and negative battery pack voltage. Battery switch is opened
temporarily.
Switch ON the output switch at the front door.
According to the startup procedure for single unit, set the operation mode of each
UPS: single mode is changed to parallel mode; set the parallel number for each
UPS; up to 4 units can be parallel; set the ID of each cabinet, the ID of each unit
must be different.
Switch ON the input switch. Close the external input switch and start from mains.
After start from mains, check the LCD interface of each UPS to see if the ID, VA is
the same with the actual values.
Switch ON the external battery switch of each UPS. Check if the charging current
displayed in LCD is normal.
Note!
The UPS cannot be parallel until each single unit is normal
.
4.3 The Display
Power
t
500kVA
50kVA
Setting
d
Date/time
Current fault
and event
log in
Logo
Home
Operation staus
Data
Item
Содержание YMK3300-200k
Страница 1: ...150 600kVA 4256 4774 A...
Страница 10: ...8 200kVA Standard and Full configuration top entry standard configuration full configuration Connect copper bar...
Страница 47: ...45 4 3 4 1 Basic Setting Click basic setting enter by input the correct password The user password is 111111...
Страница 60: ...58 4 3 5 Maint Software update Touch corrention history download and battery self test...