The auger conveyor drive (1) is located on the pick-up on the left-hand side of the machine.
The drive chain is tensioned by the clamping element (2).
Check the Chain Tension:
The length of the spring when tightened must be a = 30 mm.
Correct the Chain Tension:
• Turn the nut (3) to increase or reduce the spring tension of the compression spring (2) until
distance a= approx. 30 mm is set
Pos: 52.132 /Ü berschriften/Ü berschriften 3/U-Z/Walzenantri eb_Antri ebskettenspannung @ 488\mod_1482228107655_78.docx @ 3282527 @ 3 @ 1
13.20.4
Roller drive
Pos: 52.133 /BA/Wartung/R undballenpr esse/Ketten spannen/Spannen Ketten Walzenantrieb_Comprima @ 336\mod_1430198526772_78.docx @ 2559101 @ @ 1
1
RPN00055
2
a
2
3
Fig. 210
The roller drive (1) is located on the right side of the machine.
Check the Chain Tension:
The length of the spring when tightened must be a=220 mm.
Correct the Chain Tension:
• Turn the nut (3) to increase or reduce the spring tension of the compression spring (2) until
distance a=220 mm is set.
Pos: 52.134 /Layout M odul e /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1
Содержание Comprima F 125
Страница 385: ...150 102 161 00 Comprima F 125 F 155 1 3 5 5 6 1 2 3 ...
Страница 387: ...150 102 161 00 Comprima F 125 XC F 155 XC 2 3 1 3 5 5 A A1 P K3 K1 7 7 3 A B A A1 P K21 K20 1 ...
Страница 389: ...150 102 247 00 Comprima V 150 V 180 1 3 4 T P 50 180 bar ST A MS 1V1 S F R F R 1V1 Q30 6 5 5 3 1 T 1 2 ...
Страница 399: ... LUFXLW GLDJUDP GRFXPHQW QR YHUVLRQ 5XQGEDOOHQSUHVVH 53 RPSULPD 9 1 ...
Страница 425: ......