
Operation
169
Pos: 48.101 /Ü berschriften/Ü berschriften 2/P-T /RRoll boden spannen und F eder vorspannung eins tell en @ 79\mod_1314690152708_78.docx @ 697584 @ 2 @ 1
11.20
Tighten the floor conveyor and set the spring pretensioning
Pos: 48.102 /Abkürzung en /Abkürzungen sprachneutral/R undball enpressen/C ompri ma F 125 (XC) @ 262\mod_1399898256615_0.docx @ 2000262 @ @ 1
Comprima F 125 (XC)
Pos: 48.103 /BA/Bedi enung /R undball enpresse/Roll bodenSpannen des Rollbodens (COMPR IMA F125) @ 79\mod_1314628031949_78.docx @ 697293 @ @ 1
5
c
b
1
COM00323
3
a
4
5
2
2
b
Fig. 140
The rear floor conveyor can be retensioned with the set screw (1). The floor conveyor is
correctly pretensioned if the tension lever (2) “a” = 5 mm is raised up from the groove (4) of the
support (3).
Adjusting the Floor Conveyor:
Loosen the screws (5)
3. Raise the support (3) with the set screw (1) until dimension "a" = 5 mm is reached.
4. Tighten the screws (1).
5. Check the dimension “b”, it must be 480-490 mm from the inside of one eyelet to the next
and must not be changed.
Note
The screws can also be moved to position "c".
Pos: 48.104 /Layout M odul e /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1
Содержание Comprima F 125
Страница 385: ...150 102 161 00 Comprima F 125 F 155 1 3 5 5 6 1 2 3 ...
Страница 387: ...150 102 161 00 Comprima F 125 XC F 155 XC 2 3 1 3 5 5 A A1 P K3 K1 7 7 3 A B A A1 P K21 K20 1 ...
Страница 389: ...150 102 247 00 Comprima V 150 V 180 1 3 4 T P 50 180 bar ST A MS 1V1 S F R F R 1V1 Q30 6 5 5 3 1 T 1 2 ...
Страница 399: ... LUFXLW GLDJUDP GRFXPHQW QR YHUVLRQ 5XQGEDOOHQSUHVVH 53 RPSULPD 9 1 ...
Страница 425: ......