7 Preservation
6.5 Storing the pump station
6.5 Storing the pump station
During the test run, the internal components of the pump station are wetted with test oil, which has a
preservative effect. The pipe connections are fitted with protective covers. Unless otherwise specified,
the outer parts of the pump station are preserved with a single-coat PU-based two-component paint.
The preservative applied at the factory will protect the pump station for about six weeks, if it is stored in
a dry and clean location.
The manufacturer offers a long-term preservation for storage times of up to 60 months. The pump sta-
tion is additionally packed in hermetically sealing anti-corrosion paper.
Personnel qualification:
o
Transport personnel
Aids:
o
Mobile crane, forklift, hoisting equipment
ATTENTION
Damage to equipment and corrosion if stored improperly and during longer standstills.
► Protect the pump station against damage, heat, sunlight, dust, moisture and magnetic fields.
► Protect against corrosion during longer standstill.
► Observe measures for storing and preservation.
1.
Store cool and dry and protect against sunlight.
2.
Ensure that the anti-corrosion paper is not damaged.
3.
Observe the intervals for preservation
Ä
6.6 Heating system (optional)
6.6.1
Storing heating elements
1.
Store the heating element in an absolutely dry room or in hermetically sealed plastic bags.
2.
If the heating element has absorbed humidity, dry it for eight hours in a drying furnace at 180 °C.
7 Preservation
7.1 Preservation table
Preservation has to be carried out additionally under the following conditions:
Type of delivery
Condition
Standard delivery
o
Storage time exceeding six weeks
o
Unfavourable storage conditions such as high humidity,
salty air, etc.
Delivery with long-term preservation
o
Opened or damaged packaging
Tab. 13: Conditions for additional preservation
7.2 Preserving the inner surfaces
Personnel qualification:
o
Trained personnel
Personal protective equipment:
o
Work clothing
o
Protective gloves
o
Safety boots
Aids:
o
Castrol Rustilo DWX 33 or other preservative offering compar-
able protection
1.
Open the strainer cover.
2.
Pour the preservative into the station block until it reaches approx. 2 cm under the rim, while
slowly turning the fan impeller of the motor in the direction of rotation at the pumps.
3.
Close the strainer cover.
4.
After about six months storage check the filling level of the oil and if necessary top up.