Page 14
COMPLETING THE INSTALLATION
Negative Pressure check: A negative pressure check must be completed to verify proper operating
conditions have been met. This reading must be written on the warranty card to validate the warranty.
Procedure:
1. Open the right side and panel to access the
vacuum switch and connections.
NOTE: The side panels are removable for easier
access. Open the panel approximately 12" and lift
the panel off the hinges at the back.
2. Disconnect the black hose from the fitting at the side
of the stove.
2. Attach manometer hose to the fitting. The pressure
should read ‘0'.
3. Press on the ‘On/Off’ button on the control board.
You will have approximately 30 seconds to obtain
the water column reading on the manometer.
NOTE: The reading should be .10" w.c. or more
negative pressure. Once draft is established, the
reading will be 0.24" w.c. or higher negative
pressure.
IMPORTANT: The negative pressure must always be
above 0.05" w.c. for operation of the
control circuit board.
4. The #2 LED light will turn on. This is because the
vacuum switch has been temporarily disconnected.
5. Depress the ‘On/Off’ button the control circuit board.
The board will then reset when it is depressed to the
‘On’ position when lighting the stove.
6. Disconnect manometer hose from the fitting.
7. Attach black hose from vacuum switch to the fitting.
NEGATIVE PRESSURE READING: ________________
Disconnect black hose from the fitting.
Attach manometer hose to the fitting
.
_____ Warranty information completed:
_____ Homeowner training session completed.
Serial # _________________________
Date of Purchase: ____________________
Содержание OLV-PC OLIVIA
Страница 18: ......