28
1. Connect the hydraulic connections to
the heat pump.
2. Check the internal tightness hydraulic
connections.
3. Thermally insulate the wires inside
the building. In case of heat pumps
with cooling function use thermal
insulation and vapor barrier.
4. Safety valve drain line through
ventilation should be connected
to the pipe with a slope to sewage
system.
Connecting the secondary circuit
C
B
A
D
A
- DHW exchanger supply (on the heating water side): G 1¼ (internal thread)
B
- DHW return and return from the DHW exchanger: G 1¼ (internal thread)
C
- DHW supply: G 1 1/4 (internal thread)
D
- Safety valve drain line
Connecting the refrigerant circuit
For surface cooling systems (e.g. heating circuit in a heating system cooling mat) a
humidity switch is required (accessory additional).
Requirements for the humidity switch:
■
Electrical connection, depending on the type of humidity switch:
- 24 V (recommendation):
Connection to F11 on the controller and sensor PCB
- 230 V ~, 0.5 A:
Connection to X3.8 / 3.9 on head terminals
■
Installation in the room to be cooled on the chilled water supply (remove thermal
insulation if necessary).
■
If more rooms with varying humidity are required for the cooling circuit air, install
several humidity switches and connect them in series:
Design the switch contacts as normally closed contacts.
Содержание HPS Z Series
Страница 1: ...HPS Z Assembly and operating instructions Original instructions Heat Pump ...
Страница 44: ...44 Indoor module Laying electrical wiring to the space connection ...
Страница 148: ...KOSPEL Sp z o o 75 136 Koszalin ul Olchowa 1 Poland tel 48 94 31 70 565 serwis kospel pl www kospel pl Made in Poland ...