Kongsberg EM 710
3
Check that the specified sacrificial anodes have been
mounted, and that any specified anti-fouling paint has been
applied correctly.
4
Check that all system units have been fastened properly and
that all nuts and bolts have been tightened properly.
5
Check that the data from the motion sensor, the heading
sensor and the positioning system are correctly read by the
EM 710 and that the values are reasonable before un-docing.
The steps in this procedure may be incorporated in the “Harbour
Acceptance Test” carried out as a final check to test both the
installation and the main functions of the system.
108
164851/C
Содержание EM 710
Страница 1: ...Installation Manual EM 710 Multibeam echo sounder ...
Страница 2: ......
Страница 3: ...Kongsberg EM 710 Multibeam echo sounder Installation Manual Kongsberg Maritime 164851 C June 2009 ...
Страница 44: ...Kongsberg EM 710 Figure 10 Transducer mounting principles 42 164851 C ...
Страница 63: ...Cable layout Figure 20 Transceiver Unit front view 0 5 x 1 degree 164851 C 61 ...
Страница 88: ...Kongsberg EM 710 Figure 42 Cable clamp Transceiver Unit cable clamp on page 133 86 164851 C ...
Страница 112: ...Kongsberg EM 710 10 1 Installation Drawings 10 1 1 0 5º mounting frame assembly TX module 110 164851 C ...
Страница 113: ...Installation drawings 164851 C 111 ...
Страница 114: ...Kongsberg EM 710 10 1 2 1 mounting frame assembly RX module 112 164851 C ...
Страница 115: ...Installation drawings 164851 C 113 ...
Страница 116: ...Kongsberg EM 710 10 1 3 2 mounting frame assembly TX RX module 114 164851 C ...
Страница 117: ...Installation drawings 164851 C 115 ...
Страница 118: ...Kongsberg EM 710 10 1 4 0 5 x 1 gondola 116 164851 C ...
Страница 119: ...Installation drawings 164851 C 117 ...
Страница 120: ...Kongsberg EM 710 10 1 5 Transducer TX1 Outline dimensions 118 164851 C ...
Страница 121: ...Installation drawings 164851 C 119 ...
Страница 122: ...Kongsberg EM 710 10 1 6 Transducer TX2 Outline dimensions 120 164851 C ...
Страница 123: ...Installation drawings 164851 C 121 ...
Страница 124: ...Kongsberg EM 710 10 1 7 Transducer RX1 Outline dimensions 122 164851 C ...
Страница 125: ...Installation drawings 164851 C 123 ...
Страница 126: ...Kongsberg EM 710 10 1 8 Transducer RX2 Outline dimensions 124 164851 C ...
Страница 127: ...Installation drawings 164851 C 125 ...
Страница 128: ...Kongsberg EM 710 10 1 9 HWS Operator Station Outline dimensions 126 164851 C ...
Страница 129: ...Installation drawings 10 1 10 Transceiver Unit Outline dimensions 164851 C 127 ...
Страница 130: ...Kongsberg EM 710 128 164851 C ...
Страница 131: ...Installation drawings 10 1 11 Transceiver Unit 2 x 2 degree system Outline dimensions 164851 C 129 ...
Страница 132: ...Kongsberg EM 710 130 164851 C ...
Страница 133: ...Installation drawings 10 1 12 Transceiver Unit mounting bracket 164851 C 131 ...
Страница 134: ...Kongsberg EM 710 10 1 13 Junction Box outline dimensions 132 164851 C ...
Страница 135: ...Installation drawings 10 1 14 Transceiver Unit cable clamp 164851 C 133 ...
Страница 153: ...Installation drawings 164851 C 151 ...
Страница 155: ...EM 710 Multibeam echo sounder Installation manual EM 710 Multibeam echo sounder Maintenance manual ...