Delays may occur if any of the equipment related to the system
is not available for Kongsberg Maritime AS for testing. During
sea trials, the vessel must be at Kongsberg Maritime’s disposal
when required, even though we cannot be held responsible for
expenses relating to the running costs of the vessel.
After completion of the commissioning, the equipment should
be officially handed over to the end user and the appropriate
documents signed in accordance with the contract. All defects or
deviations from the contract must be specified in detail in these
documents. It should be noted that if such defects or deviations
are not specified, they cannot be used by any of the parties
concerned as valid reason for not signing the documents.
2.4.3 Installation, supervision and
commissioning
Electrical and mechanical installation
The installation shipyard is normally responsible for the
installation of the entire system. In addition, the shipyard
is responsible for providing and connecting all cables other
than special cables supplied with the equipment. The actual
installation and cable laying must comply with the vessel’s
classification rules and the recommendations given in this
manual.
Base frames may be required for some units. If so, these must be
manufactured in accordance with the drawings provided in the
applicable sections in this manual.
During the installation period, the equipment must be covered in
such a way that it is protected from dust, paint spray/splashes and
welding/cutting sparks. Precautions must be taken to ensure that
no part of the equipment is used as a work platform, or for any
other purpose for which it was not designed.
Note
Any damage incurred during the installation period, even with a
Kongsberg Maritime AS representative present, is the installation
shipyard’s responsibility unless it can be proven that the damage
was due to production or material defects in the equipment
delivered by Kongsberg Maritime AS, or irresponsibility by
Kongsberg Maritime AS personnel.
Pre-commissioning and acceptance tests
Pre-commissioning and acceptance tests are conducted by
Kongsberg Maritime AS personnel.
164851/C
15
Содержание EM 710
Страница 1: ...Installation Manual EM 710 Multibeam echo sounder ...
Страница 2: ......
Страница 3: ...Kongsberg EM 710 Multibeam echo sounder Installation Manual Kongsberg Maritime 164851 C June 2009 ...
Страница 44: ...Kongsberg EM 710 Figure 10 Transducer mounting principles 42 164851 C ...
Страница 63: ...Cable layout Figure 20 Transceiver Unit front view 0 5 x 1 degree 164851 C 61 ...
Страница 88: ...Kongsberg EM 710 Figure 42 Cable clamp Transceiver Unit cable clamp on page 133 86 164851 C ...
Страница 112: ...Kongsberg EM 710 10 1 Installation Drawings 10 1 1 0 5º mounting frame assembly TX module 110 164851 C ...
Страница 113: ...Installation drawings 164851 C 111 ...
Страница 114: ...Kongsberg EM 710 10 1 2 1 mounting frame assembly RX module 112 164851 C ...
Страница 115: ...Installation drawings 164851 C 113 ...
Страница 116: ...Kongsberg EM 710 10 1 3 2 mounting frame assembly TX RX module 114 164851 C ...
Страница 117: ...Installation drawings 164851 C 115 ...
Страница 118: ...Kongsberg EM 710 10 1 4 0 5 x 1 gondola 116 164851 C ...
Страница 119: ...Installation drawings 164851 C 117 ...
Страница 120: ...Kongsberg EM 710 10 1 5 Transducer TX1 Outline dimensions 118 164851 C ...
Страница 121: ...Installation drawings 164851 C 119 ...
Страница 122: ...Kongsberg EM 710 10 1 6 Transducer TX2 Outline dimensions 120 164851 C ...
Страница 123: ...Installation drawings 164851 C 121 ...
Страница 124: ...Kongsberg EM 710 10 1 7 Transducer RX1 Outline dimensions 122 164851 C ...
Страница 125: ...Installation drawings 164851 C 123 ...
Страница 126: ...Kongsberg EM 710 10 1 8 Transducer RX2 Outline dimensions 124 164851 C ...
Страница 127: ...Installation drawings 164851 C 125 ...
Страница 128: ...Kongsberg EM 710 10 1 9 HWS Operator Station Outline dimensions 126 164851 C ...
Страница 129: ...Installation drawings 10 1 10 Transceiver Unit Outline dimensions 164851 C 127 ...
Страница 130: ...Kongsberg EM 710 128 164851 C ...
Страница 131: ...Installation drawings 10 1 11 Transceiver Unit 2 x 2 degree system Outline dimensions 164851 C 129 ...
Страница 132: ...Kongsberg EM 710 130 164851 C ...
Страница 133: ...Installation drawings 10 1 12 Transceiver Unit mounting bracket 164851 C 131 ...
Страница 134: ...Kongsberg EM 710 10 1 13 Junction Box outline dimensions 132 164851 C ...
Страница 135: ...Installation drawings 10 1 14 Transceiver Unit cable clamp 164851 C 133 ...
Страница 153: ...Installation drawings 164851 C 151 ...
Страница 155: ...EM 710 Multibeam echo sounder Installation manual EM 710 Multibeam echo sounder Maintenance manual ...